MSERC · Meghalaya State Electricity Regulatory Commission
Meghalaya Standard of Performance (7 of 2026) Regulations, 2026
Meghalaya State Electricity Regulatory Commission (Standard of Performance) (7 of 2026) Regulations, 2026
RegulationDated 21 Sep 2026MSERC/SOP-REG/2026/217 dated 21st September 2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission re-enacts its Standard of Performance framework. The notification records that the 2012 SOP regulations were reviewed so as to align with the newly notified Supply Code and the Electricity Right of Consumers Rules 2020; a draft was published on 19 August 2026 for comments by 11 September 2026, and a public hearing was held on 21 September 2026 attended only by MePDCL officials (p3). The regulations apply to all distribution licensees, including deemed licensees under section 14, and to their consumers across Meghalaya, and take effect from Gazette publication (p4).
Regulations 1–5 set scope, define the vocabulary (urban and rural areas, EHV/HT/LT, consumer indexing, CAIDI/CAIFI, Supply Code), state the objectives, and set out the statutory machinery: compensation for failure under section 57(2), a duty to report achieved performance and compensation paid for annual publication by the Commission, and section 142 penal action against identified responsible officers (p4–7).
Regulations 6–9 create the three-tier scheme — guaranteed standards in Schedule I as minimum service levels differentiated by population concentration, overall standards in Schedule II as targets, and compensation in Schedule III for guaranteed-standard failures (p7). Licensees must publish a complaint-handling manual within sixty days, in English and local languages, and register specified supply, metering, billing and commercial complaints through call centres or sub-divisional offices (p8–9).
Regulations 10–13 require a 24x7 toll-free call centre (urban deadline fixed, rural left to case-by-case Commission specification), consumer indexing on urban and rural deadlines, consumer awareness through bill inserts and displays, and the compensation mechanism: automatic where parameters can be remotely monitored, an online claim facility, adjustment against bills, no recovery through ARR, and carve-outs where the cause lies with the STU/CTU, grid failure, transmission faults or SLDC instructions (p9–11).
Regulations 14–19 set quarterly reporting within fifteen days of quarter close, define what counts as a power interruption and the events that suspend the standards, and give the Commission powers to remove difficulties and to amend; the SOP is subordinated to the Supply Code where the two conflict, and the 2012 regulations are repealed with a savings clause (p11–13).
Schedule I is the operative core: guaranteed standards for call-centre response, restoration by fault type (fuse, overhead line, underground cable, transformer) on separate urban and rural clocks, voltage-fluctuation handling, meter reading/testing/replacement, shifting of meters and service lines, new connections and additional load, temporary supply, bill complaints, disconnection and reconnection (p14–19). Schedule II sets a percentage-of-cases compliance threshold for most parameters plus ceilings on faulty meters and billing mistakes, streetlight repair, load-shedding plan approval and a reliability-index regime (SAIFI, SAIDI, MAIFI, CAIFI, CAIDI) computed monthly on 11 kV and 33 kV feeders (p20–22). Schedule III maps each guaranteed parameter to a per-case or per-day compensation amount (p24–25), and Annexures I–VII prescribe the quarterly, call-centre, compensation, faulty-meter, reliability and complaint-register reporting formats (p26–33).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.