Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Reconstitution of the State Advisory Committee

RegulationDated 27 Aug 2013Published in the Gazette 30 Sep 2013

1 amendment to it is on Voltaic, dated 31 Oct 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

APSERC issued this notification on 27 August 2013 under Section 87 of the Electricity Act 2003 to reconstitute the State Advisory Committee (SAC), with immediate effect and until further order (p1). The gazette carrying it is dated 30 September 2013 (p1).

Page 2 sets out the remaining SAC members in a table, beginning at serial 9: Chief Engineer (Power), Central Electrical Zone; an authorised MNRE representative; the Labour Commissioner; Director of Industries; President, Arunachal Chamber of Commerce; Controller, Legal Metrology & Consumer Affairs; Director NERIST; Director APEDA; and M.D. HPDCAPL. The Secretary, APSERC is to be Convener (p2).

The same page lays down SAC functioning: meeting frequency and venues are left to the Commission; it specifies quorum, bars proxy attendance, allows the Chairperson to invite non-members as special invitees, fixes members' term and extension by the Commission, and requires notice and agenda before meetings (p2).

Page 3 adds powers for the Commission to remove difficulties in giving effect to the rules and to amend the SAC's composition within the Act, and carries the Secretary's signature (p2–3).

Standard name
State Advisory Committee
Primary topics
Advisory committees

Read with this

Amendments and corrections

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document