Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

TANGEDCO ToD Tariff Report

REPORT ON TIME OF DAY (TOD) TARIFF FOR TANGEDCO

Draft regulationDated 26 Jul 2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultant study report prepared by ABPS Infrastructure Advisory Pvt. Ltd. for TANGEDCO, intended to support a revised Time of Day (ToD) tariff proposal before the Tamil Nadu Electricity Regulatory Commission. It is framed as compliance with TNERC's direction in the MYT Order dated 11 August 2017 to study hourly consumption patterns and submit a ToD proposal with the next tariff petition (p10–11, p17).

Chapter 1 sets out TANGEDCO's background, its generation and tied-up capacity, consumer base and the legal and policy case for ToD under s.62(3) of the Electricity Act, the National Electricity Policy, Tariff Policy 2016, the Forum of Regulators and APTEL's direction in Appeal No. 257 of 2012 (p6–11). It also records TNERC's earlier ToD decisions and the study's scope and consultant appointment (p12–21).

Chapter 2 describes the present framework: ToD applies only to HT 1A industrial consumers, with a peak surcharge and off-peak rebate, while other categories pay flat energy charges (p22–23). It reviews how other states structure ToD, including seasonal and category coverage differences (p25–33), then sets out the data collected for CY2017 and CY2018 — HT consumer slot consumption, system demand, source-wise purchase and LGBR — and explains that all HT categories, not just HT 1A, are being studied (p34–35).

Chapter 3 is the demand analysis. It uses load duration curves, demand histograms, monthly demand curves and seasonal comparisons to identify morning and evening peaks, off-peak night hours and two seasons, and proposes new ToD slots with separate treatment of morning and evening peaks in one season (p36–59). It then examines category-wise consumption and contribution to demand, noting that LT categories are a large share but lack ToD metering and that HT Industry dominates HT consumption (p60–64).

Chapter 4 turns to supply cost. It estimates peak energy purchased and the weighted cost of meeting peak demand, compares that with the additional revenue from the existing peak surcharge and the cost of the off-peak rebate, and finds substantial under-recovery (p65–67). It evaluates raising the peak surcharge versus extending ToD to more categories, discusses why Railways and street lighting are poor candidates, and recommends raising the peak surcharge to 25% while extending ToD to all HT categories except Railways and Temporary, plus LT commercial and industrial consumers above 25 HP, with the 5% off-peak rebate retained (p68–70).

Chapter 5 lists the recommendations: new slots, two seasons, differentiated peak charges in Season 1, a 25% peak surcharge, broader category coverage and continuation of the off-peak rebate (p71). It states that the proposal is for the next control period from FY 2019-20 to FY 20121-22 and should be filed as an annexure to TANGEDCO's tariff petition (p71–72).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Wheeling and retail supply tariff, Demand-side management and demand response

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document