GUIDELINES FOR LOAD FORECASTS, RESOURCE PLANS, AND POWER PROCUREMENT PROCESS.
GuidelinesDated 12 Jul 1999No. 31/99 dated The 12th July, 1999
Summary
Summary written by software. Check the regulator's original before you rely on it.
HERC issued these guidelines on 12 July 1999 by notification No. 31/99 (p1). They govern how licensees in Haryana — currently HVPN under its Transmission and Bulk Supply Licence and Distribution and Retail Supply Licence, both issued 5 February 1999 — prepare load forecasts, resource plans and power procurement proposals (p1, p3). An explanatory note explains that the guidelines respond to the Haryana Electricity Reform Act, 1997 and licence conditions requiring economical, transparent power purchase; they follow public consultation and the Commission may amend or supplement them (p1–2).
Section 1 states the guidelines apply while licensees forecast demand, formulate resource plans and, for HVPN, formulate power purchase proposals under their licence conditions (p3). Section 2 sets out Load Forecast requirements: annual ten-year demand forecasts by area of supply, with data, assumptions and methodology; DSM and efficiency effects; load categories; loss forecasts and reduction plans; seasonal and time-of-day load shape; comparison with actual load growth; and uncertainty ranges (p3–4). Section 2.4 gives the Commission's review process — requests for information, possible hearing and deemed adoption if no action (p4).
Section 3 deals with Resource Plans: a standard requiring plans to be reviewable, appropriate, robust and uniform, with biennial preparation and immediate notice of significant changes (p4–5). It details Power Procurement Planning by HVPN — coordination with distribution and generation companies, State Government, Commission, Regional Electricity Board and CEA; a least-cost plan over at least ten years; specified data, capacity and energy balances and a two-year implementation plan (p5–7). It then covers Transmission Planning and Distribution Planning, including system studies, planning standards and investment schedules (p7–8), and Commission review (p8–9).
Section 4 governs Power Procurement: a procedure requiring prior notification and filing before entering a PPA, with exceptions for short-term or emergency purchases and Commission-permitted non-competitive purchases (p9–10); demonstration of need and departure from the plan (p10); and the Competitive Procurement Process, including filing requirements, principles, Commission review, notification of outcome, intervention, record retention and continuing oversight (p10–15).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.