Summary
Summary written by software, from pages 1 to 121 of 193. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's five-year tariff determination regulation, notified at Jaipur on 18 February 2025 as No. RERC/Secy/Reg. 157 under Section 61 read with Section 181 of the Electricity Act, 2003 (p96). It governs how the Commission will determine generation, transmission, SLDC, wheeling, retail supply and open-access charges from FY 2025-26 to FY 2029-30, while matters up to FY 2024-25 — including review matters — remain under the 2004, 2009, 2014 and 2019 tariff regulations (p96). It applies statewide but expressly not to captive generating plants or renewable energy source plants, though mini and micro hydel plants are covered. It comes into force from gazette publication.
Part I (Regs 1–3, p96–109) gives the short title, extent and commencement, then roughly ninety definitions (p97–108) — notably a full emission-control-system vocabulary (AUXe, ODe, emission control system) alongside standard capital-cost, availability, fuel and accounting terms — and sets the scope: supply by a generating company to a distribution licensee, intra-state transmission, intra-state wheeling, recovery of SLDC expenses, retail sale, cross-subsidy surcharge under the first proviso to s.42(2) and additional surcharge under s.42(4). Regulation 3(2) requires the Commission to adopt, rather than determine, tariffs discovered through s.63 competitive bidding.
Part II (Regs 4–15, p109–119) fixes a five-year control period from 1 April 2025, the elements of the tariff principles (forecast ARR, truing up, pass-through of controllable and uncontrollable gains/losses, annual determination), an optional multi-year tariff route for licensees and SLDC, the annual filing cycle with 30 November as the normal date, a possible six-month interim extension of the FY 2024-25 tariff, a Commission-set trajectory for losses and collection efficiency, the truing-up procedure and its factor taxonomy, the required contents of ARR/tariff petitions (including voltage-wise cost of supply, cross-subsidy statements, subsidy statements and other-business disclosures), mine-mouth fuel transfer price petitions, the order and newspaper-publication process, and subsidy handling under Section 65 — where ₹5 Crore is the threshold that splits monthly from annual payment of subsidy (p118) — plus publication and communication of tariff orders.
Part III begins at p119, giving capital-cost recognition for existing and new projects, prudence check, ceiling limits where a PPA fixes capital cost, and initial spares capitalisation ceilings by asset class (p119–121).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.