KERC · Karnataka Electricity Regulatory Commission

Rights of Consumers Relating to Supply of Electricity, Standards of Performance (SoP) and allied matters Regulations, 2022

Karnataka Electricity Regulatory Commission (Rights of Consumers Relating to Supply of Electricity, Standards of Performance (SoP) and allied matters) Regulations, 2022

RegulationDated 7 Oct 2022No: KERC/3/DDD/2022-23/1039 dated 07.10.2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KERC Notification No. KERC/3/DDD/2022-23/1039 dated 7 October 2022 consolidates Karnataka's consumer-facing distribution obligations into a single instrument (p1). The preamble explains that the Electricity (Rights of Consumers) Rules, 2020 issued by the Ministry of Power made the Commission's earlier consumer regulations out of date; a draft was published on 10 November 2021 for stakeholder comments and a public hearing was held on 27 December 2021, after which the Commission adopted a shortened title (p1-3).

Regulation 1 makes the Regulations applicable to all Distribution Licensees and Consumers in Karnataka, brings them into force on publication in the State Gazette — no Gazette date is printed — and provides that the 2020 Rules prevail where the two are inconsistent (p4). Regulation 2 defines the voltage-based consumer classes and defines 'Complaint' by excluding theft, offences/penalties and accident matters under the Act (p4-7).

Regulation 3 sets the procedure and timeframes for supply on request: acknowledgement and deemed receipt of applications, a reduced document set for smaller loads, supply deadlines by area and by voltage, self-execution cases, coordination with the transmission licensee for EHT, rural electrification, and the consequences of default by either side, including per-day penalties on the licensee and deemed servicing of the applicant's installation (p7-10).

Regulation 4 requires 24x7 supply and adopts SAIDI/SAIFI as reliability parameters, with a minimum outage duration below which interruptions are not counted (p10-11). Regulation 5 makes the Schedule-I standards the minimum service levels and Schedule-II the overall standards. Regulation 6 builds the automatic compensation mechanism: a remote-monitoring tool, an online claim facility and the payment route through bill adjustment, with escalation to the CGRF and Ombudsman (p11-15). Regulations 7-10 cover complaint handling, the 24x7 call centre and CRM, and the existing grievance redressal framework (p15-16). Regulation 11 carries general provisions — doorstep service for senior citizens, outage communication, publicity duties, repeal of three 2004 regulations with savings, force majeure relief and power to issue practice directions (p16-19). Schedules I-III and Forms A/B plus Formats C/D carry the standards, escalation matrix, compensations and claim formats (p20-32).

Standard name
Standards of Performance, Duty to Supply on Request, Electricity (Rights of Consumers) Rules
Primary topics
Standards of performance, New connections and load changes, Consumer grievance redressal (CGRF)

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document