AERC · Assam Electricity Regulatory Commission
Fuel and Power Purchase Price Adjustment Regulations, 2024
AERC (Fuel and Power Purchase Price Adjustment) Regulations, 2024
RegulationDated 11 Jul 2024Published in the Gazette 19 Jul 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission's FPPPA Regulations, 2024 replace the Commission's 2010 formula regulations (as amended in 2012) and set out how the State's distribution licensee passes month-to-month changes in fuel cost, power purchase cost and transmission charges through to consumers without a fresh tariff order. Regulations 1–2 (p1–2) give the title, statewide extent, commencement on Gazette publication, and definitions — including the FPPPA surcharge itself, deviation, the deviation settlement mechanism, ancillary services and the financial-year conventions.
Regulation 3 (p3–4) is the operative formula: a monthly FPPPA built from the gap between actual and projected average power purchase cost and between actual and base transmission charges for the month two months before billing, normalised by billed energy, average billing rate and loss factors. It excludes DSM charges and defers ancillary and SCED charges to true-up, and prescribes a separate fuel cost adjustment for each thermal station, with distinct energy-charge-rate formulas for coal-based and gas-based plants.
Regulation 4 (p4–6) sets the computation and recovery machinery: automatic monthly billing subject to annual true-up, the two-month lag, forfeiture of recovery rights if the licensee misses the timeline, a capped carry-forward permitted only when the monthly surcharge exceeds a set share of the variable tariff, carrying cost on carried-forward amounts, banded automatic recovery with the differential claimed at true-up, treatment of over- and under-recovery, audited submissions, billing-system interoperability and website publication. It also sets a verification fee of 0.15% of the claimed amount (p7).
Regulation 5 (p6–7) governs implementation in consumer bills, simultaneous reporting to the Commission, procurement-plan discipline and prior approval for material variations, and exclusion of excess fuel transit and handling losses. Regulations 6–12 (p8) give the regulations overriding effect over four named AERC regulations and confer difficulty-removal, direction-making, relaxation, amendment and interpretation powers. Regulation 13 (p9) replaces the 2010 regulations with a savings clause.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.