Skip to content

AERC · Assam Electricity Regulatory Commission

Resource Adequacy Framework Regulations, 2024 — Guidelines

Guidelines to be followed for applicable provisions under AERC (Framework for Resource Adequacy) Regulations, 2024

GuidelinesDated 10 Oct 2024

Made under the Framework for Resource Adequacy Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Assam Electricity Regulatory Commission issued this one-page notification on 10 October 2024 to guide how the applicable provisions of its Resource Adequacy Regulations are to be followed (p1). It first records the background: the Ministry of Power's Electricity (Amendment) Rules, 2022, Rule 16 required state commissions to frame resource adequacy regulations in line with central guidelines and Forum of Regulators model regulations, and AERC issued draft regulations on 6 September 2024 (p1). The guidelines then address planning reserve margin: distribution licensees and the STU/SLDC may adopt the CEA's PRM or compute their own, with justification and Commission approval (p1). They explain that PRM depends on loss of load probability and normalized energy not served, to be adopted as the CEA stipulates from time to time (p1). Finally, they restate the long-term, short-term and residual contracting shares for distribution licensees under Regulation 12.10 (p1).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

The regulation

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document