Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Multi Year Tariff Regulations, 2026

Kerala State Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2026

RegulationDated 16 Oct 2026Published in the Gazette 22 Oct 2026No. 1010/Con.Engg/ 2026/ KSERC

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KSERC's principal multi-year tariff code for the five-year control period 2027-28 to 2031-32. It is made under s.181(1) read with several Electricity Act 2003 provisions, was notified on 16 October 2026 and published in the Kerala Gazette on 22 October 2026; it comes into force from Gazette publication, except Regulation 58 and Annexure 3, which start on 1 April 2027 (p1, p11). It applies to KSEB Ltd's generation, transmission and distribution SBUs and successors, other generating companies, ESSDs, captive users, distribution and transmission licensees, grid users and the SLDC (p11).

Chapter I sets the control period, scope, definitions and interpretation rules, including what is meant by availability, controllable and uncontrollable factors, energy storage systems and commercial operation (p11–30). Chapter II establishes the MYT architecture: year-wise ARR and expected revenue forecasts, truing up, a mid-term performance review in 2029-30, prudence check, ceiling operating norms, trajectories for selected variables, pass-through of uncontrollable gains/losses, sharing of controllable gains, KSEB Transfer Scheme principles, liquidation of regulatory asset/surplus and truing-up procedure (p31–42). It fixes 30 November 2026 for the first control-period petitions and 30 November 2029 for the mid-term review petition (p32).

Chapter III prescribes the tariff petition process, admission, notice, objections, hearing, the 120-day order timeline, adherence to tariff orders and quarterly returns; it covers generation/ESS, transmission/SLDC and distribution petitions (p43–49). Chapter IV sets the financial principles: prudent management, capital cost and additional capitalisation, interest during construction, consumer contributions and grants, debt-equity, depreciation, return on equity or net fixed assets, working capital, interest and carrying cost, electricity duty accounting, terminal liabilities, tax and decapitalisation (p50–68).

Chapter V is the distribution chapter. It deals with sales and revenue forecasting, distribution-loss trajectories, supply availability, power procurement plans linked to the Resource Adequacy Regulations, approval of PPAs and short-term procurement, power purchase quantum and cost, collection efficiency, ARR components, O&M norms under Annexure 10, SOP-linked incentives, contingency reserves, bad debts, non-tariff and other income, wheeling charges, bulk and retail tariff, the fuel and power purchase cost adjustment surcharge, subsidy and cross-subsidy/additional surcharge (p69–92). It also provides for proposals on demand-based fixed charges, ToD/ToU tariff, kVAh billing, recategorisation, demand response and green tariff (p46–48).

Chapter VI covers transmission: capital investment plans and prudence check, adoption of TBCB tariffs, availability norms and incentives, ARR components, O&M, contingency reserves, other income, intra-state transmission charges, transmission losses and reactive-energy charges (p93–102). Chapter VII covers the SLDC's ARR, capital investment plan, fees and key performance indicators (p103–105). Chapter VIII covers generation: capital cost, renovation/modernisation/uprating, tariff petitions, hydro and thermal operating norms, annual fixed charges, O&M, incentives, declared-capacity demonstration, early commissioning and billing/deviation charges (p106–118).

Chapter IX creates the energy storage tariff framework for BESS, pumped storage and other ESS, including ESSDs, community storage, demand response, peak-hour support, grid-forming BESS technical standards, capital cost, operating parameters, depreciation, working capital, O&M, capacity charges, cycle-efficiency incentives, ramp-rate demonstration and billing (p119–133). Chapter X provides powers to remove difficulties, give directions, relax, amend and inquire, and repeals the 2021 Tariff Regulations with savings (p134–135). The annexures carry methodologies and formulas, depreciation schedules, capital-investment guidelines, COD rules, O&M methodology, ARR/tariff formats and Additional Disclosure Statement formats (p140–331); the Explanatory Note explains the background and is expressly not part of the notification (p136–139).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Commencement notices and reasons

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document