Summary written by software. Check the regulator's original before you rely on it.
The document is a consultative paper issued by the Bihar Electricity Regulatory Commission to publish and invite comments on a draft regulation for Green Energy Open Access (GEOA) in Bihar. Pages 1–3 set out the background: the national renewable and net-zero targets, the Ministry of Power's Green Energy Open Access Rules, 2022 (notified 06.06.2022) and their two 2023 amendments, the designation of POSOCO/Grid Controller of India as Central Nodal Agency, and the Forum of Regulators' model-regulation exercise. It records that the North Bihar Power Distribution Company, for both Bihar DISCOMs, petitioned for GEOA regulations and tariff determination (petition dated 27.02.2024), that the Commission admitted it as Case No. 06/2024, and that by order dated 25.05.2024 the Secretariat was directed to publish the draft. The paper fixes a comment deadline of 27.06.2024 and a hearing on 09.07.2024, and says the draft is at Annexure-I (p3).
The Annexure-I draft (pp4–19) contains the proposed BERC (Green Energy Open Access) Regulations, 2024. Chapter 1 (pp4–6) covers short title, extent and commencement (whole of Bihar; in force from Gazette publication), the objective of providing a methodology for open-access and banking charges, and definitions — including a 100 kW eligibility threshold for a Green Open Access Consumer, 'Entity', 'Banking', 'Standby charges' and 'Obligated Entity'. Regulation 5 (pp7–8) specifies a uniform RPO and the routes by which any entity may elect renewable energy: own generation, open access procurement, requisition from a distribution licensee, captive generation, RECs, or green hydrogen/ammonia.
Chapter 2 (pp8–10) specifies the nodal agencies — SLDC for short-term and STU for medium/long-term GEOA — and the procedure: a single-window portal, a State Nodal Agency procedure to be approved within 30 days, deemed approval within 15 days, first-in-first-out processing, minimum 12 time-blocks, and ineligibility grounds.
Chapter 3 (pp10–17) specifies the charge heads: transmission, wheeling, cross-subsidy surcharge, additional surcharge, standby charges, banking charges and other charges, including who determines each, exemptions, capping principles, dedicated-system cost recovery, banking in kind and lapsed-energy treatment. Regulations 9–15 (pp17–19) cover settlement priority for consumers and generators, curtailment priority, special energy meters, grid-code compliance, energy losses and dispute resolution. The final miscellaneous chapter (p19) gives the Commission powers to issue directions, relax, amend and remove difficulties.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.