Registered No. WB/SC-247 No. WB(Part-I)/2020/SAR-38 Kolkata Gazette
Published by Authority
MAGHA 2] WEDNESDAY, JANUARY 22, 2020 [SAKA 1941
No. 65/WBERC Dated, the 21.01.2020
In exercise of the powers conferred by sub-section (1) and (2) of section 181 read with section 61 of the Electricity Act, 2003 (36 of 2003) and all powers enabling it on that behalf, the West Bengal Electricity Regulatory Commission (WBERC) hereby makes the following regulations to amend the West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2011 along with subsequent amendments vide Notification no. 49/WBERC dated 27.08.2012 (hereinafter referred to as "First Amendment") and Notification no. 54/WBERC dated 30.07.2013 (hereinafter referred to as "Second Amendment"), collectively termed as Principal Regulations.
(xa) "GCV as received" means the GCV of coal as measured at the unloading point of the thermal generating station through collection, preparation and testing of samples from the loaded wagons, trucks, ropeways, Merry-Go-Round (MGR), belt conveyors and ships in accordance with the IS 436 (Part-1/ Section 1)-1964 and clause 6.2 of IS 1350 (Part-II)-1970:
Provided that the measurement of coal shall be carried out through sampling by a third party to be appointed by the generating companies from the list maintained by the Ministry of Coal, Government of India/ Coal India Limited:
Provided further that samples of coal shall be collected either manually or through hydraulic augur or through any other method considered suitable keeping in view the safety of personnel and equipment:
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
Poha aticpns ay op van n ne and testing of samples for measurement of GCV in a fair and transparent manner.
The rat the applicable delay payment surcharge arising from non-payment electriciy charges as h ars cn excpt L&M ultu rshall 0 p delay or pro-rated for part thereof upto 3 months of delay, 1.50% per month of delay or pro-rated for part t p ey y m o for payment upto the date preceding the date of payment.
The rates he applicable delaye payment surcargearisng from non-payment electriciy hargs as also other charges for the L&MV agriculture consumers shall be as in the following table:
| SI. No. | Period of non-payment | LPSC Rate |
|---|---|---|
| 1 | Up to 3 months | Nil |
| 2 | From 91 days to 180 days | 1% per month or prorated for part thereof |
| 3 | From 181 days to 365 days | 1.25% per month or prorated for part thereof |
| 4 | Above 365 days | 1.5% per month or prorated for part thereof |
fuel cost (LFC) of a generating station and shall consist of the following costs:
n os l yh n he p moi Sn plbe: Provided that any refund of taxes and duties along with any amount received on account o penalties from fuel supplier shall be adjusted in fuel cost:
in case of a thermal generating station shal be determined separately by the Commission.
The landed el cos rimay el y monh shall cnsis bas unloading and handling charges:
be submitted along with the application for FCA/FPPCA:
n hl company including any adjustment on account of quantity and quality:
Provided that, no demurge charge of railway rakes shall generally be allowed. However, or any demurrage of any demurrage:
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
Provided also that in case of coal-fired thermal generating station, the Gross Calorific Value shall be measured by third party sampling and the expenses towards the third-party sampling facility shall be reimbursed by the beneficiaries.
For coal the transit and handling losses shall be as per the norms specified in Schedule-9A and 9D of these Regulations.
The Commission through specific tariff orders to be issued for each generating station shall approve the energy charge rate at the start of the control period. During tariff determination, fuel mix of different type of fuels or among different quality of same type of fuel shall be considered as per mixing proportion of last one year, subject to specific provision in the PPA, if any, or any proposed deviation by the licensee or generating.
THE KOLKATAGAZETTE, EXTRAORDINARY, JANUARY 22, 2020
company with proper supporting document and also subject to prudence check. The price of each type of fuel for the first ensuing year shall be as per the latest declared price of such fuel received from the tariff applicant or from the declared price list of the coal company. The energy charge rate for subsequent years shall be computed considering the escalation rates notified by the CERC for payment purposes from time to time under competitive bidding guidelines:
Provided that, during FPPCA/ FCA calculations, actual price of fuel shall be considered. However, in case where applicant cannot provide actual data of different fuels, fuel mix of different type of fuels or among different quality of same type of fuel, it shall be considered as per mixing proportion of the fuels received in the year for which FPPCA /FCA is under calculation.
In case of part or full use of alternative source of fuel supply by coal based thermal generating stations other than as agreed by the generating company and beneficiaries in their power purchase agreement for supply of contracted power or the fuel mix considered in the Tariff order on account of shortage of fuel or optimization of economic operation through blending, the use of alternative source of fuel supply shall be permitted to generating station:
Provided that in such case, prior permission from beneficiaries shall not be a precondition, unless otherwise agreed specifically in the power purchase agreement:
Provided also that where the energy charge rate based on weighted average price of fuel upon use of alternative source of fuel supply exceeds 30% of base energy charge rate as approved by the Commission in the Tariff Order for that year or exceeds 20% of effective energy charge rate including MFCA of previous month whichever is lower shall be considered and in that event, prior consultation with beneficiary shall be made at least three days in advance.
Regulation 5.8.15 of the Principal Regulations shall be deleted.
For sub-clause (a) of clause (i) of regulations 2.8.1.4.2 and clause (i) of regulation 2.8.1.4.4 of the Principal Regulations the word "UHV" shall be substituted with the word "GCV".
For regulation 8.5.4 of the Principal Regulations, the following regulation shall be substituted:
"8.5.4 Notwithstanding anything contained in these Regulations and in supersession of any regulation pertaining to this subject mentioned in any other Regulations of the Commission, for any payment made within due date, an additional rebate of 1% of the amount of energy bill excluding meter rent, taxes, duties, levies and arrears (not being arrears due to revision of tariff) will be applicable, if such payment is made through e-payment gateway using (i) debit card or (i) credit card or (ii) internet banking or (iv) NEFT/ RTGS or (v) National Automated Clearing House (NACH) or (vi) electronic clearing system or (vii) any other mode viz., valued card wallet system or USSD or Instapay of banks or (viii) online payment through mobile software application which is an optional payment scheme to the consumer for payment of energy bill to any licensee other than payment mode through own cash counter of the licensee. The applicable e-payment gateway service charge, if any, to the service provider is to be borne by the licensee. Licensee shall maintain proper accounting of such charges which shall be adjusted during APR after prudence check:
Provided that such additional 1% rebate is not applicable for payment through Letter of Credit (LC) mechanism maintained with any bank by the consumer:
Provided also that any additional charges claimed by banks or service provider like LC charges, charge for NEFT/ RTGS, etc. are to be paid by the consumers themselves.
Illustration: Any payment to the licensee through LC mechanism shall not be qualified for additional rebate of 1% as revenue collection through LC mechanism is not always free from manual intervention from the licensee's end even when payment is made through the modes (i) to (viii) mentioned in this regulation and depends upon the agreement / arrangement between the LC issuing bank and the consumer, leaving a possibility of non-payment of full amount of the bill when it exceeds the LC amount.
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
"(v) Where biomass fuel is used for blending with coal, the landed cost of biomass fuel shall be worked out based on the delivered cost of biomass at the unloading point of the generating station, inclusive of taxes and duties as applicable. The energy charge rate of the blended fuel shall be worked out considering consumption of biomass based on blending ratio as specified by Authority or actual consumption of biomass, whichever is lower."
In the first sentence of parameter 'FC' under sl no (iii) of paragraph A and sl no (ii) of paragraph B of Schedule -7A of the Principal Regulations the words "UHV range" shall be deleted.
The parameter Coaluy under Clause (b) of paragraph-B of Schedule-7B of the Principal Regulations shall be substituted as below:
"Coalgcy= Average Gross Calorific Value (GCV) of coal as received (Kcal/Kg) less 120 kCal/kg"
In clause (d) of paragraph-B of Schedule-7B of the Principal Regulations the word "Coalumy" shall be substituted with the word "Coalocy".
Amendment in Annexure-C1 of the Principal Regulations:
13.1 For the Table in Annexure - C1 of the principal Regulations, the following shall be added under "HV & EHV Consumers":
| Sl No | Class of consumers | WBSEDCL | CESC LTD | IPCL | DPL | DVC |
|---|---|---|---|---|---|---|
| (xix) | Metro rail/ Airport under RCS-UDDAN | Applicable | Applicable | Applicable | Applicable | Applicable |
| (xx) | Military Engineering services (MES) | Applicable | Applicable | Applicable | Applicable | Applicable |
| (xxi) | EV charging station | Applicable | Applicable | Applicable | Applicable | Applicable |
14.1 Form no D1, D2 and D3 of the Principal Regulations shall be deleted.
14.2 The following Forms shall be inserted after Form C of Annexure-1.
"Form - D: Details of Source wise Fuel for Computation of Energy Charges
Name of the Petitioner:
Name of the Generating Station:
| SL. No. | Description | Unit | For preceding Year / Month | ||
|---|---|---|---|---|---|
| <YEAR> /<Month> | |||||
| FSA | Captivemine | e-Auction | Imported | Others | |
| A) | OPENING QUANTITY | ||||
| 1 | Opening Quantity of Coal | (MT) | |||
| 2 | Value of Stock | (Rs) | |||
| B | QUANTITY for current year/month | ||||
| 3 | Quantity of Coal supplied by Coal Company | (MT) |
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
| SL. No. | Description | Unit | For preceding Year / Month / | FSA | Captivemine | e-Auction | Imported | Others |
|---|---|---|---|---|---|---|---|---|
| 4 | Adjustment (+/-) in quantity supplied made by Coal Company | (MT) | ||||||
| 5 | Coal supplied by Coal Company (3+4) | (MT) |
| 6 | Amount charged by the Coal Company | (Rs.) | |||||
|---|---|---|---|---|---|---|---|
| 7 | Adjustment (+/-) in amount charged made by Coal Company | (Rs.) | |||||
| 8 | Handling, Sampling and such other similar charges | (Rs.) | |||||
| 9 | Total amount Charged (6+7+8) | (Rs.) |
| 10 | Transportation charges by rail/ship/road transport | (Rs.) | |||||
|---|---|---|---|---|---|---|---|
| By Rail | |||||||
| By Road | |||||||
| By Ship | |||||||
| ……….. | |||||||
| 11 | Adjustment (+/-) in amount charged made by railways/Transport Company | (Rs.) | |||||
| 12 | Demurrage Charges, if any | (Rs.) | |||||
| 13 | Cost of diesel in transporting coal through MGR system, if applicable | (Rs.) | |||||
| 14 | Total Transportation Charges (10+11+12+13) | (Rs.) | |||||
| 15 | Total amount Charged for coal supplied including Transportation (9+14) | (Rs.) |
| 16 | Landed cost of coal (2+15)/(1+5) | (Rs./MT) | |||||
|---|---|---|---|---|---|---|---|
| 17 | Consumption of coal | (MT) | |||||
| 18 | Closing stock [1+5-17] | (MT) | |||||
| 19 | Closing value [2+15-16 X 17] | (Rs.) | |||||
| 20 | Weighted average cost of coal [∑ (16 X 17) /∑17] | (Rs./MT) |
| 21 | 'GCV as billed' of coal supplied | (kCal/Kg) | |||||
|---|---|---|---|---|---|---|---|
| 22 | Weighted average 'GCV as billed' of coal | (kCal/Kg) | |||||
| 23 | 'GCV as received' of coal supplied | (kCal/Kg) | |||||
| 24 | Weighted average 'GCV as received' of coal | (kCal/Kg) |
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
Note:
Name of the Petitioner:
Name of the Generating Station:
| SL. No. | Description | Unit | / | Grade-wise-details |
|---|---|---|---|---|
| 1 | \ | Quantity | MT | |
| Amount charged by the coal company | Rs./MT | |||
| Handling, Sampling and such other similar charges | Rs./MT | |||
| Transportation cost | Rs./MT | |||
| GCV as billed | kCal/kg | |||
| GCV as received | kCal/kg | |||
| 2 | \ | Quantity | MT |
| A | TOTAL QUANTITY | MT |
|---|---|---|
| B | TOTAL COST OF COAL | Rs. |
| C | TOTAL OF HANDLING, SAMPLING AND SUCH OTHER SIMILAR CHARGES | Rs. |
| D | TOTAL TRANSPORTATION COST | Rs. |
| E | Wt. average GCV as billed | kCal/kg |
| F | Wt. average GCV as received | kCal/kg |
Note: Add rows for more sources.
Name of the Petitioner:
Name of the Generating Station:
| SL. No. | Description | Unit | / | Grade-wise-details |
|---|---|---|---|---|
| 1 | \ | Quantity | MT |
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
| SL. No. | Description | Unit | / | Grade-wise-details |
|---|---|---|---|---|
| 1 | Quantity | MT | ||
| Amount charged by the coal company | Rs./MT | |||
| Handling, Sampling and such other similar charges | Rs./MT | |||
| Transportation cost | Rs./MT | |||
| GCV as billed | kCal/kg | |||
| GCV as received | kCal/kg | |||
| 2 |
| A | TOTAL QUANTITY | MT |
|---|---|---|
| B | TOTAL COST OF COAL | Rs. |
| C | TOTAL OF HANDLING, SAMPLING AND SUCH OTHER SIMILAR CHARGES | Rs. |
| D | TOTAL TRANSPORTATION COST | Rs. |
| E | Wt. average GCV as billed | kCal/kg |
| F | Wt. average GCV as received | kCal/kg |
Note: Add rows for more sources.
Applicant
Name of the Petitioner:
Name of the Generating Station:
THE KOLKATA GAZETTE, EXTRAORDINARY, JANUARY 22, 2020
| SL. No. | Description | Unit | / | Grade-wise-details |
|---|---|---|---|---|
| C | TOTAL OF HANDLING, SAMPLING AND SUCH OTHER SIMILAR CHARGES | Rs. | … | |
| D | TOTAL TRANSPORTATION COST | Rs. | ||
| E | Wt. average GCV as billed | kCal/kg | ||
| E | Wt. average GCV as received | kCal/kg |
Note: Add rows for more sources.
Name of the Petitioner:
Name of the Generating Station:
| SI No. | Description | Unit | / |
|---|---|---|---|
| 1 | \ | Quantity | MT |
| Amount charged by the coal company | Rs./MT | ||
| Handling, Sampling and such other similar charges | Rs./MT | ||
| Transportation cost | Rs./MT | ||
| GCV as billed | kCal/kg | ||
| GCV as received | kCal/kg | ||
| 2 | \ | ||
| …… | |||
| A | TOTAL QUANTITY | MT | |
| B | TOTAL COST OF COAL | Rs. | |
| C | TOTAL OF HANDLING, SAMPLING AND SUCH OTHER SIMILAR CHARGES | Rs. | |
| D | TOTAL TRANSPORTATION COST | Rs. | |
| E | Wt. average GCV as billed | kCal/kg | |
| F | Wt. average GCV as received | kCal/kg |
Note: Add rows for more sources.
Name of the Petitioner:
Name of the Generating Station:
| SI No. | Description | Unit | / |
|---|---|---|---|
| 1 | \ | Quantity | MT |
| Amount charged by the coal company | Rs. / MT |
THE KOLKATAGAZETTE, EXTRAORDINARY, JANUARY 22, 2020 [PART I]
| Handling, Sampling and such other similar charges | Rs. / MT |
|---|---|
| Transportation cost | Rs. /MT |
| GCV as billed | kCal/kg |
| GCV as received | kCal/kg |
| 2 | \ |
| …… | …. |
TOTAL QUANTITY MT
TOTAL COST OF COAL Rs.
TOTAL OF HANDLING, SAMPLING AND SUCH OTHER SIMILAR CHARGES Rs.
TOTAL TRANSPORTATION COST Rs.
Wt. average GCV as billed kCal/kg
Wt. average GCV as received kCal/kg
Note: Add rows for more sources.
Applicant
By order of the Commission,
Place: Kolkata T.K. MUKHERJEE
Date: 21.01.2020 Secretary of the Commission
Published by West Bengal Electricity Regulatory Commission, West Bengal and printed at Saraswaty Press Ltd. (Government of West Bengal Enterprise), Kolkata 700 056.