Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge Regulations, 2025 — Draft

Karnataka Electricity Regulatory Commission (Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge) Regulations, 2025

Public notice on a draftDated 12 Dec 2025No. DD(Tariff)/CSS-Roadmap/2025-26/ 1322 dated 12th December 2025

Public notice on a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KERC's draft Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge Regulations, 2025, issued as a draft notification dated 12 December 2025 for public consultation, with objections invited within 30 days of gazette publication (p3).

The preamble (pp1-3) explains why the Commission is acting: the Electricity Act's mandate to reduce cross-subsidies, clause 8.3 of the Ministry of Power Tariff Policy of 28.01.2016 requiring tariffs to move within a band of the average cost of supply with intermediate milestones, and a Karnataka High Court direction of 20.12.2024 in W.P. 4344/2024 (Renew Wind Energy (Karnataka) Pvt Ltd v. Union of India) to frame regulations specifying how surcharge and cross-subsidies are progressively reduced. A table at p2 records each LT and HT tariff category's cross-subsidy position against average cost of supply for FY2025-26 to FY2027-28 as determined in Tariff Order-2025 of 27.03.2025; the Commission says it has already met the band for all categories except EV charging stations (LT-6c) and private lift irrigation (HT-3), so its room to manoeuvre is limited.

The draft regulations follow at pp3-6. Regulation 1 names the regulations and makes them effective from gazette publication; Regulation 2 applies them to consumers and open access consumers under Section 42 in Karnataka; Regulation 3 defines average tariff, average cost of supply, cross subsidy, and the cross-subsidising and cross-subsidised categories. Regulation 4 sets the roadmap — a six-financial-year glide path from FY2028-29 for the two out-of-band categories, each with an annual reduction step, readjustment of the categories that cross-subsidise them, and a carve-out for temporary power supply. Regulation 5 commits the Commission to keep all categories within the band and caps discretionary adjustments. Regulation 6 leaves cross subsidy surcharge methodology and rates entirely to the Tariff Policy issued by the Government of India. Regulations 7-10 are savings, removal-of-difficulties, amendment and interpretation clauses.

Primary topics
Subsidy and cross-subsidy, Open access charges

Read with this

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document