Skip to content

PSERC · Punjab State Electricity Regulatory Commission

4th MYT Regulations 2025 — Order on Objections

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2025

OrderDated 14 Aug 2025

Made under a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 28 of 38. Check the regulator's original before you rely on it.

This is PSERC's order of 14.08.2025 on the draft Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2025 — the 'PSERC 4th MYT Regulations 2025' (p1). It is not the regulation text: it is a provision-by-provision record of the objections filed in response to the Commission's public notice, followed by the Commission's analysis and decision on each. Page 1 sets the context — the PSERC MYT Regulations 2022 came into force on 01.04.2023 and run to 31.03.2026 for the 3rd MYT Control Period (FY 2023-24 to FY 2025-26); the draft for the 4th Control Period (FY 2026-27 to 2028-29) was prepared in line with the existing regulations with changes drawn from the CERC Tariff Regulations 2024 and in view of PSPCL's acquisition of GVK, operationalization of the Pachhwara Coal Mine and revised thermal emission standards. A public notice was issued on 14.06.2025; PSTCL (Objector No. 1) and PSPCL (Objector No. 2) objected.

Sections A–D (pp2–8) cover accounting and capital expenditure: segregation of generation and distribution accounts, the classification of ARR items as controllable, normative or uncontrollable and the related O&M true-up, the approval route for emergency capex, and the timing of capital-expenditure true-up. All objections are rejected, the Commission citing past non-compliance, consumer burden and the difficulty of testing capex annually.

Sections E–H (pp9–12) cover financing: exclusion of income tax from the transmission/SLDC ARR, reactive power charges within intra-state transmission charges, the SBI MCLR-linked normative basis for long-term loan interest, and the working-capital interest rate. The reasoning is that interest and tax are pass-through items and that a normative basis shields consumers from a utility's weak credit standing.

Sections I–K (pp12–16) cover O&M under Regulation 25. 'Extraordinary situation' is deliberately left undefined; unfunded pension and gratuity stays on 'pay as you go' — the one point where the Commission accepts a change, treating payments to a terminal-benefits Trust as satisfying that principle (p15); R&M on assets added during the year remains limited to R&M, with PSTCL's pending APTEL appeal noted (p16).

Sections L–P (pp16–28) cover non-tariff income (including the 50% share of the timely-payment rebate), the gain-sharing/loss-bearing rule, the late payment surcharge period, the components of working capital, and adoption of CERC norms for generating-station performance parameters. PSPCL's detailed case on station heat rate, oil consumption and auxiliary consumption at its ageing thermal plants is set out at length.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Voltaic does not hold the regulation itself.

No other documents to read with it are on Voltaic.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document