PSERC · Punjab State Electricity Regulatory Commission
4th MYT Regulations 2025 — Order on Objections
Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2025
OrderDated 14 Aug 2025
Made under a regulation Voltaic does not hold.
Summary
Summary written by software, from pages 1 to 28 of 38. Check the regulator's original before you rely on it.
This is PSERC's order of 14.08.2025 on the draft Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2025 — the 'PSERC 4th MYT Regulations 2025' (p1). It is not the regulation text: it is a provision-by-provision record of the objections filed in response to the Commission's public notice, followed by the Commission's analysis and decision on each. Page 1 sets the context — the PSERC MYT Regulations 2022 came into force on 01.04.2023 and run to 31.03.2026 for the 3rd MYT Control Period (FY 2023-24 to FY 2025-26); the draft for the 4th Control Period (FY 2026-27 to 2028-29) was prepared in line with the existing regulations with changes drawn from the CERC Tariff Regulations 2024 and in view of PSPCL's acquisition of GVK, operationalization of the Pachhwara Coal Mine and revised thermal emission standards. A public notice was issued on 14.06.2025; PSTCL (Objector No. 1) and PSPCL (Objector No. 2) objected.
Sections A–D (pp2–8) cover accounting and capital expenditure: segregation of generation and distribution accounts, the classification of ARR items as controllable, normative or uncontrollable and the related O&M true-up, the approval route for emergency capex, and the timing of capital-expenditure true-up. All objections are rejected, the Commission citing past non-compliance, consumer burden and the difficulty of testing capex annually.
Sections E–H (pp9–12) cover financing: exclusion of income tax from the transmission/SLDC ARR, reactive power charges within intra-state transmission charges, the SBI MCLR-linked normative basis for long-term loan interest, and the working-capital interest rate. The reasoning is that interest and tax are pass-through items and that a normative basis shields consumers from a utility's weak credit standing.
Sections I–K (pp12–16) cover O&M under Regulation 25. 'Extraordinary situation' is deliberately left undefined; unfunded pension and gratuity stays on 'pay as you go' — the one point where the Commission accepts a change, treating payments to a terminal-benefits Trust as satisfying that principle (p15); R&M on assets added during the year remains limited to R&M, with PSTCL's pending APTEL appeal noted (p16).
Sections L–P (pp16–28) cover non-tariff income (including the 50% share of the timely-payment rebate), the gain-sharing/loss-bearing rule, the late payment surcharge period, the components of working capital, and adoption of CERC norms for generating-station performance parameters. PSPCL's detailed case on station heat rate, oil consumption and auxiliary consumption at its ageing thermal plants is set out at length.
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.