UPERC · Uttar Pradesh Electricity Regulatory Commission
Multi Year Tariff for Distribution and Transmission Regulations, 2019
Uttar Pradesh Electricity Regulatory Commission (Multi Year Tariff for Distribution and Transmission) Regulations, 2019
RegulationDated 23 Sep 2019In force from 1 Apr 2020UPERC/Secy./ (MYT for Distribution and Transmission) Regulations, 2019/408 dated September 23, 2019
Replaced by 2 later regulations not yet published on Voltaic
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Summary
Summary written by software, from pages 1 to 66 of 86. Check the regulator's original before you rely on it.
This document is the Uttar Pradesh Electricity Regulatory Commission's combined multi-year tariff regulation for distribution and transmission licensees. It was issued from Lucknow on 23 September 2019 under the Electricity Act, 2003 (p44). It replaces the Commission's separate Multi Year Distribution Tariff Regulations, 2014 and Multi Year Transmission Tariff Regulations, 2014 (p44). Its stated scope is existing and future distribution licensees, transmission licensees and their successors, for determination of Aggregate Revenue Requirement, Annual Performance Review, tariff, true-up and related matters (p45). It applies for the five-year control period from 1 April 2020 to 31 March 2025, comes into force on 1 April 2020, and is to remain in force for five years unless reviewed earlier or extended (p45). The proviso to the commencement clause says that each financial year's ARR, APR, tariff, true-up and review matters are governed by the tariff regulations applicable to that specific year (p45).
The English operative text begins at p44. Part A (pp50–54) sets the general principles: the MYT framework; the annual filing calendar for business plan, true-up, APR and ARR/tariff; the contents of the business plan and ARR petition; technical validation, admittance and public consultation; true-up and APR requirements; and the lists of controllable and uncontrollable factors with the treatment of gains and losses from each. It also sets out conditions for power procurement planning by the distribution licensee, including optimisation on merit-order/SCED principles and treatment of renewable purchase obligations (pp50–51).
Part B (p54) says the Commission determines ARR and tariff on petition and directs transmission licensees to Part E and distribution licensees to Part F of the regulations. It requires electronic filing and supporting data, bars capital investments without prior Commission approval from the ARR petition, and requires a tariff revision proposal and a compliance statement on past directives (p54). Part C (pp55–58) applies to power procurement by distribution licensees: procurement guidelines, the power procurement plan and its approval, STU consultation, short-term procurement without prior approval in emergency or cost-saving circumstances, and the quarterly pass-through of incremental power purchase cost, including the formula, sub-category allocation and ceiling (pp55–58).
Part D (pp59–66) contains the financial principles: financial prudence; capital expenditure/cost and capital structure; additional capitalisation; debt-equity ratio; depreciation; return on equity; interest on long-term loans; hedging cost of foreign exchange rate variation; interest on working capital; income tax; and contributions to contingency reserves (pp59–66). Several matters are left to documents not in this extract: transmission and distribution licensee-specific terms are in Parts E and F (p54), depreciation rates are in Annexure A (p63), and transmission availability computation is in Annexure B (p46).
Read with this
Amendments and corrections
One more document belongs here and is not on Voltaic: an amendment not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.