Summary
Summary written by software, from pages 1 to 31 of 39. Check the regulator's original before you rely on it.
The Kerala State Electricity Regulatory Commission's Notification No. 1316/Con.Engg/2023/KSERC dated 14 November 2023 makes the KSERC (Consumer Grievance Redressal Forum and Electricity Ombudsman) Regulations, 2023 (p1). They are made under s.181(1) and clauses (r), (s) and (zp) of s.181(2) and s.42(5), (6) and (7) of the Electricity Act 2003, apply to the whole of Kerala and come into force on the date of publication in the Official Gazette.
Chapter I (pp1–5) gives the short title, application and commencement, and requires these Regulations to be construed harmoniously with the Kerala Electricity Supply Code, 2014, the KSERC (Standards of Performance of Distribution Licensees) Regulations, 2015 and the KSERC (Renewable Energy and Net Metering) Regulations, 2020 — with those three prevailing in case of inconsistency (pp1–2). It defines the terms on which the whole scheme turns: complainant, complaint, grievance, defect, consumer, prosumer, representation, CGRF, IGRC and the Electricity Ombudsman (pp2–5).
Chapter II (pp6–8) sets up the Internal Grievance Redressal Cell: the licensee must identify, appoint and publicise a first point of contact and a registration centre, register complaints and issue a complaint number, maintain a web portal with automatic escalation, and run IGRC offices at Sub-division and Circle level with a technical/accounts and subject-officer composition. It classifies grievances into categories (supply interruption, voltage and quality, load shedding, metering, billing and collection, ownership changes, disconnection, new connections, load changes, streetlights) and prescribes the procedure for lodging and registering complaints (pp8–9). A licensee must formulate a two-level IGRC scheme within six months of the notification and obtain the Commission's concurrence, and resolve complaints at the appropriate level within seven days (p8). Distribution licensees other than KSEB Ltd with a very limited area of supply need not set up an IGRC for the time being (p6).
From Regulation 35 (p25) Chapter IV covers the Electricity Ombudsman: disqualifications and removal, powers and duties (conciliation, mediation, superintendence, budget, register, web portal), the thirty-day filing window for representations against a Forum order, maintainability and rejection grounds, disposal within three months, powers to call for information with adverse inference for non-compliance, settlement by agreement, hearing of parties, interim orders, awards and their publication, licensee compliance reporting within three months, review on new evidence or error, and quarterly reporting to the Commission (pp25–30).
Chapter V (pp30–31) provides for a Commission-funded Consumer Advocacy Cell to promote consumer education and participation in regulatory proceedings, functioning under the Compliance Examiner or another Commission-designated officer.
Read with this
Other copies of these documents (1)
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.