Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Power Quality Regulations, 2018

Meghalaya State Electricity Regulatory Commission (Power Quality) Regulations, 2018

RegulationDated 31 Oct 2018No.MSERC/POWER-QUALITY/REGULATIONS/2018/04 dated 31.10.2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Meghalaya State Electricity Regulatory Commission (Power Quality) Regulations, 2018 set the quality-of-supply and reliability standards Meghalaya's distribution licensees must meet and the harmonic limits large customers must not breach. Made under ss.181, 61, 57 and 59 of the Electricity Act 2003 (p1), they extend to the whole of Meghalaya and take effect from Gazette publication (p1; reg 5(3), p7).

Chapter 1 (pp1–5) carries title, extent and commencement plus 56 definitions — designated customers, point of common coupling, declared supply voltage, true power factor, TDD and SAIDI/SAIFI among them. Chapter 2 (pp6–8) sets objectives, the measurement framework (notified Indian Standards, failing which IEC 61000-4-30:2015), scope — distribution licensees, deemed licensees, franchisees and designated customers connected at or below 33 kV (p7) — the supply characteristics to be controlled, roles and responsibilities, and complaint-redressal timelines for voltage variation, unbalance and harmonic complaints.

Chapter 3 (pp9–16) is the standards core: supply voltage variation limits for LV/MV networks with and without transmission interconnection, flicker severity, voltage unbalance, voltage dips and swells, voltage harmonics and individual harmonic orders, current harmonics/TDD for designated customers, short interruptions, and sustained interruptions measured by SAIDI and SAIFI — each with statistical evaluation rules (7-day windows, percentile tests) and measurement standards.

Chapter 4 (pp17–19) requires phased installation of power quality meters across 33/11 kV feeders, DTRs and designated customers, continuous monitoring, compliance reporting, annual 100% self-audit plus 5% independent audit, website publication and data-security duties. Chapter 5 (pp20–22) sets the incentive/dis-incentive mechanism — a monitoring-only first year after notification, then compensation to affected consumers and from designated customers. Chapter 6 (p23) gives the Commission power to relax provisions and remove difficulties by order.

Standard name
Power Quality
Primary topics
Power quality, Standards of performance, Metering

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document