Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Consumer Complaint Handling Procedure (CCHP) 2nd Amendment, 2016

Consumer Complaint Handling Procedure (CCHP) 2 nd Amendment, 2016

AmendmentDated 12 Aug 2016No. PSERC/Secy./Regu. 115 dated th August, 2016

Amends the Consumer Complaint Handling Procedure (CCHP), 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the Consumer Complaint Handling Procedure (CCHP) that PSERC first issued in October 2013 and amended in September 2015, and it is the operative text a distribution licensee's grievance machinery in Punjab must follow (p1). The Commission states the aim is to make the procedure more transparent and consumer friendly and to enforce compliance with Standards of Performance by the distribution licensee (p1).

The bulk of the document substitutes Clause 4 in full, recasting the Dispute Settlement Committees (p1). Complaints of a general nature — service-connection and billing delays, meter defects, supply failure, voltage variation, non-restoration after outage or after payment — are to be disposed of first by the AE/AEE in charge of the sub-division; if unresolved or if the consumer is dissatisfied, the consumer may go to the Divisional Dispute Settlement Committee (DDSC) and also claim compensation for failure to meet Standards of Performance (p1–2). Monetary disputes such as wrong billing, wrong tariff, service-connection or security charges, account overhauling and voltage surcharge are routed to a three-tier committee structure — Zonal (ZDSC), Circle (CDSC) and Divisional (DDSC) — each defined by composition and by a monetary jurisdiction band, with anything above the top band going to the Forum under s.42(5) (p2–4). Open Access matters and complaints under specified sections of the Electricity Act are carved out of this route (p2). Nominees from industry and consumer organisations sit on the committees, are nominated by the Divisional or Deputy Commissioner, must meet eligibility conditions, and hold office for a fixed maximum term subject to an age limit (p3–5); their meetings must be held at a central public location outside PSPCL/PSTCL premises (p4–5).

The amendment also replaces Clause 6(8) to fix the quorum for all three committees, require unanimous decisions, and refer a matter to the Forum as a 'Complaint' where there is no consensus (p5). The closing page sets procedural discipline for hearings — monthly or more frequent sittings, advance agenda and intimation, adjournment only for recorded cause, and power to decide ex-parte after repeated non-appearance (p6). Transitional provisos keep cases already registered with each committee with that committee (p2–4).

Standard name
CGRF and Ombudsman
Primary topics
Consumer grievance redressal (CGRF), Standards of performance

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document