Complaint Handling Procedure for Distribution Licenses

ProcedureDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission-approved consumer complaint-handling rulebook that Odisha's deemed distribution licensees operate. Clause 1 states its footing: it is adopted under condition 19.2(b) of the licence conditions issued by the Commission's order of 27 October 2006 in Case No.21 of 2006, and was approved by OERC by letter dated 13 December 2007 (p1).

Clause 2 sorts consumer complaints into nine heads, from voltage and supply interruption through metering, billing, disconnection/reconnection, new connections, transfer of ownership and conversion of service, to a residual 'any other' (p1). Clause 3 is the operating core: a service-window and compensation table for each head, distinguishing compensation that is automatic from compensation the consumer must claim, and covering low voltage, restoration times, scheduled shutdowns, metering defects, billing, reconnection, new connections and conversion of service (p1–5).

Clause 4 sets the machinery: registration in a Complaint Register at every fuse call centre with a receipt, consumer inspection rights, IVRS auto-registration, complaint numbering and tracking, and a CRM-based call centre as a longer-term measure (p6). Sections 4.5 to 4.13 then give, complaint head by complaint head, the escalation ladder — where to lodge, the next higher authority, acknowledgement duties and officer-level resolution periods — with escalation tables for voltage (pp6–7), interruption (p7), scheduled shutdown (p7), metering (p8), billing (p8, Table-1), disconnection (p9, Table-2), new connections (p9, Table-3) and transfer/conversion (p10, Table-4).

Clause 5 opens the Grievance Redressal Forum route once the licensee's own time limit has expired, allows any written form, leaves the GRF jurisdiction table to be filled in by the licensee, and caps the Forum's decision time (pp10–11). Clause 6 covers the Ombudsman, with a limitation period that can be condoned (p11). Clauses 7 and 8 require field offices to comply with GRF and Ombudsman directions and to hold a notified weekly grievances day (p11). Annexures I to V supply the complaint and acknowledgement proformas, including the one for escalating to a higher authority (pp12–17).

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document