Assam Electricity Regulatory Commission (Co-generation and Generation of Electricity from Renewable Sources of Energy) Regulations, 2015
RegulationDated 14 May 2015No. AERC.299/2008/Pt-I/58
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission's 2015 Co-generation and Renewable Energy Regulations are the state's framework instrument for connecting, selling, banking and dispatching electricity from renewable sources. Notification AERC.299/2008/Pt-I/58 was made under s.62(1), s.86(1)(a), (b) and (e) and s.181(1) of the Electricity Act 2003 and extends to the whole of Assam; it comes into force on the date of publication in the Assam Gazette, which the text does not print (p1).
The Introduction (p1–2) explains that this is a revision of the 2009 regulations, whose RPO and tariff subject matter had already been moved to the 2010 RPO and 2012 RE tariff regulations, and that the 2009 regulations now stand repealed. Regulation 3 (p2–6) defines the vocabulary the rest of the document relies on — banking, firm and infirm power, CUF, net metering, grid interactive systems, interconnection point, captive generating plant, small hydro, RE power plants.
Regulation 4 (p6) fixes eligibility: MNRE-approved technologies using new plant and machinery, from small hydro through solar PV and thermal, biomass gasification and Rankine cycle, biogas, waste-to-energy, non-fossil cogeneration, wind and hybrids. Regulation 5 (p7) sorts projects into four categories — grid-connected MW-scale, grid-interactive rooftop solar, captive, and off-grid decentralised distributed generation — and Regulations 6–7 (p7) leave nodal agency designation to the State Government.
Regulations 8–13 (p7–15) are the operational core: who builds and pays for evacuation, interface lines and metering; sale routes and where tariff comes from; third-party sale; open access and concessional open access charges with a time-limited solar exemption; banking; start-up, auxiliary and shutdown drawal; CDM benefit sharing; MUST RUN status and the scheduling and despatch code for larger plants; SLDC's role; PPA, metering, billing and payment timelines with late payment surcharge and rebates; RPO compliance; generator obligations; and grid-interactive rooftop solar.
Regulations 14–20 (p15–16) give these regulations overriding effect over four earlier AERC regulations, repeal the 2009 regulations with a savings clause, and reserve to the Commission powers to remove difficulties, issue orders and directions, relax, amend, interpret and depart from its own procedure.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.