JSERC · Jharkhand State Electricity Regulatory Commission

Jharkhand Prepaid Smart Metering Regulations, 2024

Jharkhand State Electricity Regulatory Commission (Prepaid Smart Metering) Regulations, 2024

RegulationDated 23 Sep 2024Published in the Gazette 26 Sep 2024Notification No. 104 dated 23 rd September, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

JSERC's Prepaid Smart Metering Regulations, 2024 (Notification No. 104, dated 23 September 2024, gazetted 26 September 2024) create a state-wide framework for supplying electricity in Jharkhand through prepaid smart meters. Twenty clauses over ten pages; they apply to all categories of consumers, new and existing, and to every distribution licensee and distribution franchisee in the state (p2, p4).

The core is migration mechanics. Regulation 4 obliges the licensee to provide a prepaid connection on application, subject to feasibility and the Supply Code, and switches off Section 56 of the Electricity Act — the post-payment disconnection safeguards — for prepaid supply (p4). Regulation 5 leaves the migration SOP and new-connection methodology to the licensee, cross-referring the Supply Code. Regulations 7 and 10 handle money: no security or advance consumption deposit for new prepaid connections; on migration, the existing security deposit plus accrued interest is first set against arrears and the residue becomes the opening prepaid balance, with a top-up needed if it falls under the minimum recharge (p4–5, p7). Arrears must be cleared or converted into 1–5 monthly instalments before switching, with a 15-day notice before later audit-driven adjustments (p7).

Regulation 8 is the operating heart (p5–7): daily deduction of tariff charges, remote monthly reading with data pushed to the consumer, recharge in defined multiples through online and helpdesk channels, a minimum balance set by the licensee by category, three descending low-balance alerts, temporary disconnection only in a daytime window and never on Sundays or gazetted holidays, notification by SMS, and auto-reconnection on recharge. Regulation 11 escalates temporary to permanent disconnection if the account is not restored within a fixed window (p7–8). Regulations 12 and 14 cover meter replacement responsibility, consumer-procured meters, licensee sample testing and complaint testing; 9 covers consumer data protection under CEA and IT Act guidance; 15 requires vendor training and server operation; 16–20 are the Commission's standard saving, interpretation, amendment, difficulty-removal and relaxation clauses (p9–10).

Standard name
Metering Regulations
Primary topics
Metering, Billing and payment, New connections and load changes

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document