Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Procedure, Terms and Conditions for Grant of Transmission Licence Regulations, 2025 (Revision-I)

Madhya Pradesh Electricity Regulatory Commission (Procedure, Terms and conditions for Grant of Transmission Licence and Other matter of Transmission Licensee (including deemed Licensee)) Regulations, 2025 (Revision-I) {RG-11(I) of 2025}

Regulation · Gazette copyDated 12 Aug 2025No. 1644/MPERC/2025 dated 12th August 2025

The Gazette copy of the Transmission Licence Regulations, 2025 (Revision-I).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software, from pages 1 to 39 of 49. Check the regulator's original before you rely on it.

MPERC issued this principal regulation at Bhopal on 12 August 2025 under Electricity Act 2003 ss.14–19 read with s.181 (p1). It governs who may hold an intra-state transmission licence in Madhya Pradesh, how they apply, and the conditions they must meet. It applies to transmission licensees and deemed licensees and comes into force on Gazette publication, but the Gazette date is not printed (p1).

Chapter 1 (pp1–6) defines the regulatory vocabulary — licence, licensee, deemed licensee, area of transmission, licensed/other business, force majeure, STU/CTU, users and financial statements. Chapter 2 (pp7–8) puts STU at the centre of network planning, allows a State Committee, and routes projects above a Commission-specified threshold through tariff-based competitive bidding; the BPC runs bids, the SPV becomes the TSP, and the TSP must seek licence and tariff adoption within five working days of acquiring the SPV (p8). Projects below threshold or exempted go to STU/deemed licensee/state company with s.62 tariff (p8).

Chapter 3 (pp8–15) sets eligibility and the licensing procedure: application in Annexure 1 with fees, copies to STU/MPPMCL, contents, acknowledgement, public inspection, additional information, newspaper advertisement within seven working days, 21-day objection period, hearings/local inquiries, comments, two-stage grant proposal, opportunity of hearing, licence copy distribution, commencement, 25-year validity, map and licence deposit/public inspection.

Chapter 4 (pp16–29) contains general conditions: duties, open access, limits on transactions/mergers/loans/assignments, other-business approval and revenue/asset separation, subsidy control, renewal, tariff treatment (s.63 adoption or s.62 determination), undue preference, investment plans, asset transfer above the stated value threshold, and deemed-licensee coverage. Chapter 5 (pp29–31) requires separate licensed/other-business accounts, financial statements and auditor reporting. Chapter 6 (pp31–33) covers information to the Commission, major-incident reporting/compensation, studies, five-year capex plans and annual progress. Chapter 7 (pp33–34) sets annual licence fee payment and default consequences. Chapter 8 (pp34–36) sets revocation grounds and procedure. Chapter 9 (pp36–37) governs amendment of licence conditions. Chapter 10 (pp37–39) begins technical conditions: Grid Code compliance, planning/security/operating standards, review, force majeure relief, forecast and annual performance reporting.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Open access, Transmission tariff

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document