Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Arunachal Pradesh Electricity Supply Code Regulation, 2018 — Draft

Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation 2018

Draft regulationDated 9 Jan 2019APSERC/RA-14/I/Notification/2018-19/881-91

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is APSERC's draft Arunachal Pradesh State Electricity Regulatory Commission (Electricity Supply Code) Regulation 2018, released for stakeholder consultation. Page 1 is a public notice dated 9 January 2019 that prepones the public hearing on the draft Code to 25 January 2019 at 2.00 PM and says an updated draft is on the Commission's website; it refers to earlier notices of 13 and 27 December 2018 (p1). Pages 2–3 contain the draft notification and short title, scope and commencement: it is made under s.50 and s.181(2)(x) of the Electricity Act 2003, applies to all distribution and retail supply licensees (including deemed licensees) and all consumers in Arunachal Pradesh, to persons exempted under s.13, and to unauthorised supply/use/diversion/abstraction. It is to come into force on the date of Gazette publication (not printed). The Code is structured in eight Sections plus references and annexures (pp2–3, 104–155).

Section 1 (pp10–17) defines terms and interpretation rules. Section 2 (pp18–26) deals with system of supply and classification: supply frequency and voltage variation, voltage levels for LT/HT/EHT, classification by connected load/contract demand, voltage-level duties, dedicated feeders, higher/lower voltage surcharge/rebate, load balancing, power factor, safety, wiring, earth leakage protection, transformer protection, motor installation, harmonics, irrigation pump sets, parallel operation, franchisee distribution and standards of performance.

Section 3 (pp27–57) is the core service-procedure section: licensee's obligation to supply and extend the distribution system, consumer cost-sharing, conditions for connection, special categories such as multi-consumer complexes and high-rise buildings, new connection applications, registration fee, documents, processing, inspection, defect rectification, demand note, payment, release timelines, temporary supply and Tatkal Yojana, modifications, name transfer, legal heir transfer, divided premises, conversion of services, reclassification, shifting, load enhancement/reduction, annual review of contract demand, grievance redressal, agreement execution/termination, and general conditions of supply including security deposit and access to premises.

Section 4 (pp58–62) covers recovery of charges: expenses for giving supply, charges for electricity supplied, and approval of cost data by the Commission after public hearing. Section 5 (pp62–85) sets the metering, billing and payment regime: meter requirements, supply/installation, reading, testing, replacement, cost allocation, adoption of new technologies, net metering for rooftop solar, billing under normal and special circumstances, payment modes, disputed bills, late payment surcharge, instalment/early payment incentives and recovery of arrears. Section 6 (pp85–97) gives the procedure for theft and unauthorised use of electricity: inspection, evidence, show-cause notice, consumer reply, hearing, assessment orders, default consequences and appeal to the appellate authority. Section 7 (pp97–100) covers temporary and permanent disconnection and reconnection. Section 8 (pp100–103) contains general provisions: monitoring and MIS reports to the Commission, load shedding, service of notice, demand-side management, force majeure exemptions, repeal and savings, and the Commission's power to relax or remove difficulties. Section 9 (pp104–105) lists related APSERC and central regulations.

Annexures 10.1–10.14 (pp106–155) provide the forms and formats: LT and HT/EHT application forms, connected-load determination, test result report, meter complaint/testing request, theft/UUE inspection report, disconnection/termination forms, security deposit calculation, theft assessment formula, Cost Data Book for lines and substations, miscellaneous charges, and service timelines. The Cost Data Book is marked for guidance and subject to Commission ratification (p131).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document