Skip to content

CERC · Central Electricity Regulatory Commission

Repeal of Regulation of Power Supply Regulations, 2010

Gazette, Repeal of Regulation of Power Supply Regulations, 2010

RegulationDated 26 Oct 2021Published in the Gazette 1 Nov 2021No. L-1/42/2010-CERC. dated 26th October, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page CERC notification that withdraws an existing regulation rather than laying down new obligations. Page 1 is the Gazette masthead (Extraordinary, Part III—Section 4, No. 530, dated 1 November 2021); page 2 carries the operative text, signed by the Secretary and dated 26 October 2021.

Paragraph 1 records that CERC had made the Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010, which were subsequently amended by the (First Amendment) Regulations, 2021 (p2). Paragraph 2 repeals both instruments with immediate effect (p2). Paragraph 3 preserves continuity: any Implementation Plan already under implementation by a Regional Load Despatch Centre or State Load Despatch Centre on the notification date runs its normal course under the repealed regulations (p2).

The Note at the foot of p2 logs the gazette references and dates of the two repealed instruments and of the 2011 corrigendum. The document sets out no substantive regulatory parameters of its own; it is purely a repeal with a savings provision, so the substance of what was withdrawn lies in the repealed texts, not here.

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page