KERC · Karnataka Electricity Regulatory Commission
Procurement of Energy from Renewable Sources Regulations, 2026 — Draft
Karnataka Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2026
Draft regulationDated 12 Oct 2026KERC/SC(F)/RPO Regulations/2026 dated 12/10/2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
KERC has published, as a draft for public comment, regulations to replace its existing renewable procurement framework with a single State regime for renewable purchase obligations (pp1–2). The preamble sets out the trigger: a Government of India notification of 27 September 2025 under the Energy Conservation Act, as amended in 2022, reworked the renewable consumption obligation (RCO) methodology, leaving designated consumers and obligated entities under two different compliance systems; the Commission therefore proposes to repeal the existing regulations and frame new ones (pp1–2). The draft will be taken up only after thirty days from gazette publication, with objections invited in the same window to the Secretary, KERC (p2).
Regulation 1 gives the title, extends the regulations to the whole State and makes them effective from the date of gazette notification. Regulation 2 defines the working vocabulary, including obligated entity, RCO, RPO, State Agency, designated consumer and distributed and other RE. Regulation 3 is the operative core: it identifies who is obligated, prescribes how each class computes its consumption base (with carve-outs for nuclear energy, part fossil cogeneration and aluminium smelting), fixes component-wise RPO shares for four financial years, and conditions which projects may serve the wind, hydro, distributed and 'other' components, including continuity of the earlier targets (pp3–7).
Regulation 4 lists the ways RPO may be met — captive or purchased renewable energy including storage, renewable energy certificates including under virtual PPAs, or buyout payment — and Regulation 5 sets the annual monitoring chain from obligated entities through the State Agency to the Commission, with reporting deadlines and section 142 exposure for withholding information (pp7–9). Regulations 6 to 8 govern renewable energy certificates: eligible entities, accreditation for intra-State and inter-State entities, State Agency procedures, and the conditions a renewable generating station or captive station must satisfy, plus cancellation of accreditation (pp9–11). Regulation 9 splits tariff determination between Commission-determined tariffs for certain technologies and section 63 bidding for others, preserving existing PPAs (p11). Regulations 10 to 13 are enabling powers, and Regulation 14 repeals the 2011 regulations with a savings clause (p12).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.