Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Appointment of Consultants Regulations, 2015

Kerala State Electricity Regulatory Commission (Appointment of Consultants) Regulations, 201 5

RegulationDated 15 Nov 2015Published in the Gazette 1 Dec 2015No. I 573/Admn.ll 5/KSERC dated lSth November, 201 5

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission's 2015 regulations set out how the Commission itself hires consultants, making them an internal-procurement instrument rather than a licensee-facing one (p1–2). Regulation 3 states the permissible purposes of engagement — expert advice on specific issues, studies, data analysis or benchmarking, tasks needing skills unavailable in-house, and bridging unfilled regular posts — and bars routine day-to-day work where in-house capacity exists (p2–3). Regulation 4 caps any engagement at the minimum period needed for the work and in no case beyond three continuous years (p3), and Regulation 5 creates four categories: corporate, individual, staff and professional-expert consultants (p3).

Regulations 6 to 9 then give a separate selection route for each category. Corporate consultants are chosen through a Consultancy Evaluation Committee, terms of reference prepared by the Secretary, a single-stage two-envelope bid published in Malayalam and English newspapers and on the website with a minimum notice period, and evaluation on a combined quality-cum-cost basis with a prescribed minimum technical weightage and a minimum number of valid bids; an urgent, low-value route permits single sourcing (p3–5). Individual consultants go through a Member-headed committee, published applications, shortlisting and interview, with a marks-based panel and a fee decided by the Commission (p5–7). Staff consultants are engaged to absorb increased workload, with qualifications set by the Secretary against the Commission's recruitment regulations, a website notice, an interview panel and remuneration benchmarked to government or PSU pay structures; leave and leave-linked deductions are specified (p7–9). Professional experts for urgent advice are selected from a Secretary-prepared panel, subject to a fee ceiling per item of work (p9).

Regulation 10 lets the Commission relax any provision for reasons recorded in writing (p9). The Explanatory Note (p10) records the s.91(4) authority, the finding that consultant engagement is needed, the prior publication of a draft for public opinion, and the finalisation of these regulations.

Standard name
Appointment of Consultants
Primary topics
Commission staff and members

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document