Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission notification, published in the Tamil Nadu Government Gazette of 21 March 2012 (p1), amending the Tamil Nadu Electricity Supply Code, 2004. The notification is dated 17 February 2012 and states that the amendment takes effect from the date of its Gazette publication (p2). It is signed by the Commission's Secretary (p5).

The amendment substitutes Regulation 3 of the Principal Code wholesale, replacing it with a new "Categories of Supply" regulation (p2–3). The new regulation sets a ladder of supply categories by voltage and connected load/demand — single-phase 240 V, three-phase 415 V, 11 kV/22 kV, 33 kV, 110 kV and 230 kV — with load and demand limits for each, an election right for small consumers, an explanation on LTCT metering for larger LT consumers, a provision for converting non-conforming existing connections by mutual consent, and a rule that consumers opting for higher voltage than required bear the extra cost.

Regulation 5 is then amended in two places (p4): the penalty structure in clause (ii)(c) for recorded demand exceeding sanctioned demand is replaced with a graded percentage scale keyed to 112 kW, with escalating rates for repeated occurrences; a new clause (v) is inserted on metering modification costs; and a new item (d) in sub-regulation (5)(ii) defines what the security deposit includes and excludes.

The remaining amendments are short insertions: a new sub-regulation (3A) in Regulation 7 requiring ABT-compliant export/import meters at both generator and consumer ends for open access consumers, referencing the CEA (Installation and Operation of Meters) Regulations, 2006 (p5); and a substituted Regulation 13(1) on the manner of serving bills to HT and LT consumers, e-mail IDs, due-date reckoning and non-receipt of bills (p5).

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document