CERC · Central Electricity Regulatory Commission
Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities Regulations, 2010
Central Electricity Regulatory Commission (Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities) Regulations, 2010
RegulationDated 23 Sep 2010Published in the Gazette 24 Sep 2010No. L-1/1012009-CERC dated 23rd September, 2010
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the CERC's principal regulation fixing the framework under which a licensee may use another licensee's 'intervening transmission facilities' — electric lines incidental to inter-State transmission that a trading licensee or distribution licensee wants to use for long-term access or medium/short-term open access, where the parties cannot agree rates and charges (p7, p9). It is made under s.178(2)(i) and (2)(ze) read with the proviso to s.36(1) of the Electricity Act, 2003, and took effect from Gazette publication, printed as 24 September 2010 (p1, p7).
Chapter 1 (p7–10) gives the short title and commencement and defines the working vocabulary — Applicant, Contract Path, Intervening transmission facilities, Parties, Time block and the Grid Code — then limits scope: the regulation applies only where a contract path can be identified. Chapter 2 (p10–11) ties the rates and charges to Schedule-I, based on a standard distance, and provides that where the contract-path ARR is already determined, charges are shared by the ratio of average flow to peak line loading per Schedule-II. Chapter 3 (p11–13) sets the terms and conditions: contents of the application, the owning licensee's consent window, scheduling per the Grid Code, payment security for short-term use, interest on default with a right to refuse scheduling, energy accounting and deviation settlement, reactive energy charges, and a voltage-wise transmission loss table.
Chapter 4 (p13–14) gives the Commission sole adjudication of disputes (including over the contract-path method) and a removal-of-difficulties power. Schedule-I (p14) holds the ceiling rates for long-term/medium-term access and short-term open access by line type and capacity; Schedule-II (p14) holds the line loading capacities used for sharing determined transmission charges. Crucially, these are model terms and ceiling rates — parties may negotiate within the framework, and pre-existing agreements survive until they expire (p9–10). Where a State Commission has not prescribed availability or congestion norms, the CERC norms and the 2009 congestion regulations apply (p10).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.