DERC · Delhi Electricity Regulatory Commission
Demand Side Management Implementation Framework Regulations, 2012 — Draft
Delhi Electricity Regulatory Commission (Demand Side Management Implementation Framework) Regulations, 2012
Draft regulationDated 1 Feb 2012No. DERC / F.17( )/2011-12/_______________- dated February 2012
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the February 2012 draft Delhi Electricity Regulatory Commission (Demand Side Management Implementation Framework) Regulations, 2012 (p1). It is made under the Electricity Act 2003, ss.181(1), 181(2)(zp) and 23, and applies to distribution licensees in the State of Delhi (p3). It requires licensees to treat DSM as part of day-to-day operations, implement cost-effective programmes, recover justifiable DSM costs through ARR/tariff, and follow the separate DERC DSM cost-effectiveness regulations (p5–6). The DSM guiding principles direct licensees to pursue energy efficiency, peak reduction, demand response, market transformation, stakeholder consultation, BEE-aligned programmes and protection of participants/non-participants (p6–7).
The framework sets up planning machinery: assessment of DSM technical potential before every MYT control period (first within six months of notification) (p8); multi-year DSM plans and targets aligned with the MYT term and submitted with MYT filings (p8–9); formulation of a perspective plan within one year (p9–10); and a DSM Cell in each licensee within one month (p10–11). Funding is through ARR, with multi-year and annual DSM budgets, possible public benefits charge later, incentives for target achievement, prior approval for consumer-premises equity placements, and separate budget approval for load research, consumer surveys, training and awareness (p11–13).
Approval runs through the DSM Consultation Committee (DSM-CC), which reviews plans and programmes and recommends to the Commission; the Commission approves the multi-year DSM Plan, generally before the MYT period (p14–15). EM&V is to follow DERC EM&V regulations once in force, with interim programme protocols validated by DSM-CC and empanelled independent verification contractors; monitoring and reporting are quarterly/annual plus interim monthly/quarterly reports (p15–16). A completion report is due within one month of programme completion (p16). Regulation 18 gives the Commission powers to amend, remove difficulties, issue orders/practice directions and decide disputes (p16). Four annexures prescribe the DSM-CC constitution, implementation actions, elements of the DSM Plan document and elements of the DSM Programme document (p17–24).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.