Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Fees Second Amendment Regulation, 2023 — Draft

Andhra Pradesh Electricity Regulatory Commission (Fees) Second Amendment Regulation, 2023

Draft amendmentDated 2 Jun 2023Regulation 5 of 2023 dated 02.06.2023

Draft

A proposal that has since been finalised as the Fees Regulation, 2005 — Second Amendment, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft Commission instrument that rewrites individual sub-clauses of Clause 4 — the fee schedule — of the APERC (Fees) Regulation. The introduction (p1) sets out why: the Commission must fund licensing, tariff determination, dispute adjudication, review and miscellaneous services, and establishment costs and inflation have risen since the last fees amendment. It recites the earlier fee instruments it builds on and states the fee-levying power under the Electricity Act, 2003.

Clause 1 (p1) gives the short title, extends the regulation to the whole of Andhra Pradesh, and makes it effective from publication in the Andhra Pradesh Gazette. Clauses 2 to 7 each substitute a specific sub-clause of the principal regulation, without touching the rest of it.

Clause 2 (p1) restates the fee payable with an application for a transmission, distribution or trading licence. Clause 3 (p2) covers the annual licence fee for transmission licensees (levied per MW of allocated capacity), for distribution/deemed licensees and for licence-exempt entities (both levied per unit of energy handled in the year). Clause 4 (p2) sets the fee for a generating company's tariff determination application, at different per-MW rates with separate monetary ceilings for conventional and for renewable generators. Clause 5 (pp2–3) governs fees for dispute adjudication petitions, keyed to the value of relief sought and to the enabling provision invoked. Clause 6 (p3) sets review-petition fees, distinguishing reviews of tariff orders from other reviews. Clause 7 (p3) substitutes the residual head for any other petitions not covered above. The draft ends with the order of the Commission, signed at Hyderabad on 02.06.2023 (p3).

Standard name
Fees and Fines Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Amendments and corrections

Procedures and orders made under it

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document