Skip to content

KERC · Karnataka Electricity Regulatory Commission

Transmission Licence (Intra-State TBCB Projects) Regulations, 2026

Karnataka Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission License and other related matters in respect of intra-State Transmission Projects selected through Tariff-Based Competitive Bidding) Regulations, 2026

RegulationDated 21 May 2026Published in the Gazette 2 Apr 2026No. DD(Tariff)/2025-26/TBCB/ 2013 dated 21st May 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are KERC's first regulations devoted to licensing intra-State transmission projects in Karnataka that are awarded through tariff-based competitive bidding (TBCB) (p1, p3). The preamble records that the State has constituted a State Empowered Committee on Transmission and authorised KPTCL to appoint a Bid Process Coordinator, and that the Commission's role under the Ministry of Power TBCB guidelines is to grant the transmission licence under Sections 14, 15 and 86(1)(d) and to adopt transmission charges (p2). Because the existing KERC (Licensing) Regulations, 2004 do not address TBCB-selected projects, the Commission gazetted draft regulations on 02.04.2026, received three written comments, held a public hearing on 30.04.2026 with ten participants, and finalised the regulations on 21 May 2026 (p2).

Chapter 1 (p3–5) gives the short title, brings the regulations into force on gazette publication, and defines the working vocabulary — Bid Process Coordinator, project mode, Long Term Transmission Customer, STU, transmission charge and so on. Chapter 2 (p5–8) limits eligibility to persons selected through the Central Government's Section 63 competitive bidding guidelines and lays out the full application-to-grant procedure: Form-I application, e-filing and service on DISCOMs, STU and SLDC, posting on the applicant's website, newspaper notice in Form-II within three working days, a 15-day objection window, STU recommendations within 10 (extendable to 20) days, the Commission's own pre-grant public notice, a hearing, and grant in Form-III.

Chapter 3 (p8–15) is the licence itself: licensee obligations (insurance, prudent utility practice, SLDC directions, non-discriminatory open access, annual licence fee), the bar on trading, assignment to a lenders' nominee on debt default, a 25-year term with renewal, tariff adoption under Section 63 or determination under Section 62, consequences of late payment, ring-fenced accounts, inspection and reporting duties, and the amendment and revocation of licences. Chapter 4 (p15–16) covers enforcement of licence conditions, dispute resolution, communications, and the Commission's powers to relax provisions, remove difficulties and issue suo motu orders. Forms I, IIA–IIC and III with the licence schedule follow (p17–21).

Standard name
Licensing Regulations, Fees and Fines Regulations
Primary topics
Licensing and licence conditions, Competitive bidding, Transmission tariff

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document