Skip to content

GERC · Gujarat Electricity Regulatory Commission

Licensing of Electricity Trading Regulations, 2005

Gujarat Electricity Regulatory Commission (Licensing of Electricity Trading) Regulations, 2005

RegulationDated 29 Mar 2005

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

GERC's principal instrument for licensing electricity traders operating inside Gujarat, made under s.181 read with ss.15, 16, 18 and 52 of the Electricity Act 2003. It extends to the whole State and comes into force on Gazette publication, a date the document does not print (p1-2). Pages 1-32 are the operative Regulations; pages 33-41 are four appended forms.

Chapter 2 (pp2-5) fixes the vocabulary the rest of the instrument runs on — intra-state trading, the trading licence, licensed business versus other business, the April-March year — and lets the Commission review the Regulations to harmonise them with open access rules and develop power markets under s.66 (p5).

Chapter 3 (pp5-19) is the grant procedure: application in the Schedule-1 form with the State Government's fee, six sets, affidavits and ownership/group disclosures (pp5-7); newspaper notice in one English and two Gujarati dailies within seven days of applying, with a confidentiality proviso; public inspection; scrutiny and further information; objections and the applicant's replies; hearing, grant or reasoned refusal; licence commencement and 25-year duration; amendment on application or suo motu; initial and annual licence fees with interest and revocation for default; revocation on listed grounds, only after an enquiry by an adjudicating officer and three months' notice; and energy accounting, scheduling and dispatch through the SLDC under the Open Access Regulations (p19).

Chapter 4 (pp19-21) is the eligibility gate: full-time professionals in two named disciplines, a minimum net worth scaled to the volume of electricity the applicant proposes to trade across seven lettered volume categories (p20) with quarterly replenishment and audited compliance certificates, and creditworthiness tests keyed to RBI 'wilful defaulter' classification and standard borrowal accounts.

Chapter 5 (pp22-31) carries the general licence conditions: compliance with the Act, Grid Code and Commission directions; category migration based on volume traded as on 31 March; Commission-fixed trading margins; bilateral contracts backed by letters of credit; prohibitions on acquiring or merging with other licensees, transferring the licence and entering transmission; segregated accounts; quarterly information to the SLDC in Schedule 3; prudential reporting of material changes; consumer-side duties and standards of performance where a trader supplies consumers; investigation powers; and application of the general conditions to deemed licensees. Chapter 6 (pp31-32) holds savings clauses and a power to remove difficulties.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Electricity trading and trading margin, Fees payable to the Commission

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document