Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Eligibility Conditions for being a Electricity Trader Regulations, 2008

Himachal Pradesh Electricity Regulatory Commission (Eligibility Conditions for being a Electricity Trader) Regulations, 2008

RegulationDated 21 Jul 2008No.HPERC/382 dated 21st July 2008

1 amendment to it is on Voltaic, dated 9 Aug 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification of 21 July 2008 (No. HPERC/382) lays down the eligibility conditions a person must satisfy before the Commission grants a licence for intra-State electricity trading in Himachal Pradesh. It is made under section 52 of the Electricity Act 2003 read with section 181, and comes into force on publication in the Rajpatra, Himachal Pradesh (p1) — the Gazette date itself is not printed.

Regulations 1 and 2 give the title, commencement and definitions. An 'applicant' is a person applying for an intra-State trading licence; an 'electricity trader' covers both a licensed trader and distribution licensees (including those referred to in the 3rd and 5th provisos to section 14) when they trade within the State; 'intra-state trading' is buying and selling within Himachal Pradesh; net worth takes its meaning from the Companies Act 1956. Anything undefined falls back on the Act and the HPERC (General Conditions of Trading Licence) Regulations, 2004 (p2).

Regulation 3 sets the technical requirements — minimum in-house professional strength drawn from two named disciplines, disclosure of staff qualifications and experience to the Commission before trading begins, communication facilities, and a website of the trader's own (p2). Regulation 4 sets capital adequacy: an application-stage package of earnings history, balance sheet, cash flow, funding arrangement and risk-management strategy, plus a minimum net worth that steps up across seven categories (A–G) according to volume of electricity traded; category is re-fixed on volume as on 31 March each year, with the Commission to be kept informed and net worth certified by an auditor (p2–3).

Regulation 5 covers creditworthiness — auditor-certified demonstration from the second year of operation onward, no RBI-notified default, all borrowal accounts classified 'Standard', an endeavour to hold an investment-grade credit rating for traders trading above 500 MU annually, and payment security for every transaction (p3–4). Regulation 6 lists disqualifications and an open-ended 'fit and proper person' test (p4–5). Regulations 7–9 are miscellaneous: power to remove difficulties by order, power to issue orders and practice directions, and power to amend (p5).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Electricity trading and trading margin, Payment security

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document