Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Deemed Licence Conditions Regulation, 2004

A.P. Electricity Regulatory Commission (Deemed Licence Conditions) Regulation, 2004

RegulationPublished in the Gazette 1 Jul 2004In force from 10 Jun 2004Regulation No.8 of 2004

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short transitory regulation made by the Andhra Pradesh Electricity Regulatory Commission to keep existing licence conditions alive under the new Electricity Act, 2003. The introduction (p1) explains that the proviso to s.16 of the Act requires the Commission, within one year of the appointed date, to specify general or specific licence conditions for the licensees covered by the first to fifth provisos of s.14. Because the Commission was still finalising its full General Conditions of Licence regulation under s.16 and that notification would take time, it decided to issue a stop-gap regulation instead (p1–2). A draft was gazetted on 16-06-2004 with comments due by 26-06-2004; no suggestions were received (p2).

The operative part (p2) makes two things happen. First, it names and commences the regulation, with deemed commencement on 10 June 2004. Second, it deems every condition in the existing licences issued to APTRANSCO and the four distribution companies (APCPDCL, APSPDCL, APEPDCL, APNPDCL) under the A.P. Electricity Reform Act, 1998 to have been specified under s.16 of the 2003 Act, and keeps them in force until the Commission notifies its substantive regulation. Nothing new is set: the instrument is a continuity device bridging the old Reform Act licences and the new Act.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document