JSERC · Jharkhand State Electricity Regulatory Commission

Utilization of Surplus Capacity of Captive Power Plants based on Conventional Fuel Regulations, 2023

Jharkhand State Electricity Regulatory Commission (Utilization of Surplus Capacity of Captive Power Plants based on Conventional Fuel) Regulations, 2023

RegulationDated 22 Nov 2023Published in the Gazette 14 Dec 2023Notification No.95 dated 22 nd November, 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification No. 95 of the Jharkhand State Electricity Regulatory Commission, made under s.86(1)(b) of the Electricity Act 2003, builds a framework for Jharkhand's licensees to buy surplus power from captive power plants running on conventional fuels, and for those plants to take stand-by support and bank energy with the grid (p1).

Chapter 1 brings it into force on gazette publication and applies it to all conventional-fuel CPPs in the state; Chapter 2 defines the working vocabulary — firm and infirm power (defined by a tolerance band around the agreed capacity), banking, billing cycle, three CPP types (A, B and C) and stand-by support (p1–4).

Chapter 3 covers interconnection and parallel operation: CPPs follow the licensee's and SLDC's technical, safety and grid standards, bear evacuation and connectivity costs, connect at the voltage the Supply Code prescribes, and refer grid-related disputes to the Commission (p4–5).

Chapter 4 is the commercial gateway. A CPP of 1 MW and above selling surplus to a licensee must sign a Commission-approved CPP Agreement; the in-state licensee gets a first right of refusal over out-of-state sales, which lapses if no agreement is signed within a stated window; purchase rates track the licensee's approved weighted-average power purchase cost, differentiated between peak and off-peak and between firm and infirm energy (p5–7).

Chapters 5 and 6 deal with metering, invoicing, prompt-payment rebates, late payment surcharge and the 15-minute-block scheduling and settlement methodology, including restricted schedules (p7–9). Chapter 7 is the longest: eligibility, notice and billing-period rules, applicable fixed, demand and energy charges, overdrawal penalty, and an annual cap on stand-by hours that can be extended for major breakdowns — set out separately for Type A, Type B and Type C plants (p9–14).

Chapter 8 governs banking — permitted quantum, a non-banking window, slot-to-slot withdrawal rules, banking charges and the year-end treatment of unutilised banked energy (p14–15). Chapters 9 to 14 are machinery provisions: disputes to the Commission, inherent powers, power to relax, remove difficulties, amend, and final interpretation (p15–16).

Standard name
Captive Generation Regulations
Primary topics
Power procurement and PPAs, Tariff determination, Energy banking

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗