AERC · Assam Electricity Regulatory Commission
Grant of Connectivity to the Intra State Transmission System Regulations, 2025 — Statement of Reasons
Statement of reasons for Assam Electricity Regulatory Commission (Grant of Connectivity to the Intra State Transmission System) Regulations, 2025
Statement of reasonsDated 25 Mar 2025
The commission's reasons for the Grant of Connectivity to the Intra State Transmission System Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is AERC's Statement of Objects and Reasons for the Assam Electricity Regulatory Commission (Grant of Connectivity to the Intra State Transmission System) Regulations, 2025, dated 25 March 2025 (p2). It is not the regulation text; it records why the Commission framed the regulations, how the draft was consulted on, what stakeholders said, and what the Commission decided, ending with a direction to notify the final regulations in the Official Gazette (p13).
The Introduction explains that CERC's 2022 Connectivity and General Network Access Regulations and their 2023 and 2024 amendments create obligations for the Appropriate Commission, and that AERC is using its Electricity Act powers to make intra-State connectivity rules for efficient, reliable and secure operation of the North Eastern Regional Grid (p2). Section 2 records that draft regulations were hosted on the AERC website and public-noticed on 25.01.2025 in The Assam Tribune and Amar Asom, with objections due 13.02.2025, extended to 20.02.2025 at SLDC's request (pp2–3). Section 3 lists the two respondents—SLDC and Ampin Energy Transition—and the seven participants in the 17.03.2025 public hearing (p3).
Section 4 is the bulk: clause-by-clause comments and Commission decisions on the definition of connectivity, application by open-access seekers, enhancement and ratification of connectivity for already-connected entities, forfeiture of Conn-BG1/2/3 and application fees on withdrawal, partial withdrawal, additional generation/ESS capacity, cross-referencing corrections, connectivity quantum for renewable and hybrid generators, bank-guarantee modes and return periods, and metering/RTU infrastructure (pp3–13). The closing paragraphs say typographical, grammatical and referencing errors were corrected, thank stakeholders, and order finalisation and Gazette notification (p13). Analysts should use it for the Commission's reasoning and the fate of stakeholder demands; the actual rights and obligations are in the final regulations, which are not reproduced here.
Read with this
The regulation
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.