Skip to content

KERC · Karnataka Electricity Regulatory Commission

Eligibility Conditions and Duties of Electricity Trader Regulations, 2004

Karnataka Electricity Regulatory Commission (Eligibility conditions and Duties of Electricity Trader) Regulations, 2004

RegulationDated 9 Nov 2004Published in the Gazette 2 Dec 2004Y/02/4 dated 09.11.2004

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KERC's principal regulation fixing the eligibility conditions and continuing duties for a person licensed to trade electricity within Karnataka (intra-State trading only). It was issued by notification dated 9 November 2004 and notified in the Karnataka Gazette on 2 December 2004, from which date it comes into force (p1).

Regulation 2 defines the vocabulary the rest of the instrument relies on — trader, licensee, licensed business, net worth, intra-State trading, the trading year — and defers to the Electricity Act 2003 where the Act and the Karnataka Electricity Reforms Act 1999 conflict (p1–2).

Regulation 3 is the entry gate. Clause 3.1 sets technical requirements: staffing by an experienced power-sector engineer and a finance/commerce/accounts person, communication and internet facilities, a website, and filing of employee details — all to be met before trading begins regardless of licence grant (p3). Clause 3.2 sets the capital adequacy and creditworthiness regime: a net-worth ladder tied to four trading-volume categories, auditor certification at application, creditworthiness certification from the second year, no RBI defaulter status, efforts to hold an investment-grade rating in the top category, and a payment security mechanism for all transactions (p3–4).

Regulation 4 is the ongoing obligation set: compliance with the Act, Grid Code, policies and Commission directions; compliance with KERC's Licensing Regulations 2004; reporting a move to a higher volume category within a month with a corresponding net-worth increase; trading-margin filing and applicability; inspection of records; bilateral contracting with continuity-of-supply safeguards; metering for energy accounting; agreements with transmission and distribution licensees; declaration of monthly maximum volume and five-year plans; licence fee payment; directions against abuse of dominance; compliance with SLDC/RLDC/NLDC/CEA directions; separate trading accounts; and section 66 compliance (p4–5). Clause 4.2 sets the annual licence fee by the same volume categories, pro rata for part of a year (p5–6). Clauses 4.3 and 4.4 cover information supply to the Commission, SLDC and CEA, quarterly SLDC verification of energy traded, and reporting of material changes, breaches and ownership changes (p6–7).

Regulation 5 routes trading disputes between licensees and generating companies to the Commission. Regulation 6 gives the Commission power to remove difficulties, issue orders and practice directions, and amend the regulations (p7).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Electricity trading and trading margin, Fees payable to the Commission

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document