OERC · Odisha Electricity Regulatory Commission
Net Metering/Bi-Directional Metering & Solar PV Connectivity Order, 2016 — Amendment, 2025
Amendment to the Order on Net Metering/Bi-Directional Metering & their Connectivity with respect to Solar PV Projects 2016 (as amended up to 27.11.2025)
OrderDated 27 Nov 2025No. OERC-Engg. 02/2022/ 1448 dated 27.11.2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
OERC's order of 27.11.2025 amends the Commission's 19.08.2016 order on net metering / bi-directional metering and connectivity for rooftop solar PV projects, which had already been amended up to 17.01.2018 and 05.05.2022 (p1). The preamble gives the drivers: stakeholder demand for hybrid inverters, two MNRE Office Memoranda — dated 20.09.2024 permitting different inverter types including hybrids, and 21.07.2025 mandating SIM-based data loggers with M2M communication protocol — and inconsistencies between the net metering order and Government of India schemes such as PMSGY (p1).
The operative changes are as follows. A new clause 2(f) defines "Hybrid Inverter" as a bi-directional inverter interfacing solar PV modules and an energy storage system, capable of grid-interactive and stand-alone operation (p1). Clause 7 is recast so the consumer may install either a grid-tied or a hybrid inverter, with line diagrams in Annexure-I and a new Annexure-II (p1). A proviso to Clause 8 provides that for Central/State Government schemes the conditions of those schemes apply notwithstanding the existing net metering order (p1). A further sentence allows inverter communication devices, dongles or data loggers with M2M SIM protocol to substitute for a generation meter for real-time measurement and transmission of generation data (p2). New clause 10(d) allocates the cost of meters, connectivity and related works to eligible consumers, lets either the consumer or the distribution licensee procure the meter, and requires the licensee to test and install it in line with CEA Metering Regulations / the OERC Supply Code (p2). Clause 14(f) is widened to refer to the grid-tied or hybrid inverter, and Clause 14(h) is replaced with sine-wave, IEEE 519 harmonic and mandatory MNRE safety/anti-islanding standards (p2). A new Annexure-II is inserted and the existing Annexures II and III are renumbered III and IV (p2). The amendments apply prospectively from the date of notification (p2).
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.