Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Annexure-1 — Index of MYT/ARR & Tariff Filing Formats for Distribution and Retail Supply Licensees

Annexures and Forms to the MPERC Tariff Regulations, 2026 (RG-35(IV) of 2026)

OrderDated 30 Oct 2026

Made under the Terms and Conditions for Determination of Tariff for Supply and Wheeling of Electricity and Methods and Principles for Fixation of Charges Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the annexure-and-forms volume for a Madhya Pradesh distribution and retail supply licensee's multi-year tariff filing: a set of blank schedules, headed on page 3 as the 'Index of MYT/ARR & Tariff Filing Formats for Distribution and Retail Supply Licensees', that the licensee fills in when it files its MYT and aggregate revenue requirement (ARR). The schedules are laid out for the MYT control period 2027-28 to 2031-32, shown alongside historical years FY 25 to FY 28 (p6, p10, p33, p45).

Page 3 is the master index, listing every sheet by code and title in four groups: financial formats (S1–S9), expense and ARR formats (A, F1–F19), revenue formats (R1–R7) and performance formats (P1–P10). The pages that follow are the blank formats themselves, broadly in that order.

Pages 4–9 are the financial statements — profit and loss, balance sheet, cash flow, share capital and reserves, current assets and liabilities, deferred tax, other long-term liabilities and long-term loans and advances. Pages 10–18 carry the ARR and power-purchase block, with the ARR split by wheeling, retail supply and distribution activity, plus energy balance, pool-power cost, intra-state transmission (MPTRANSCO) charges, inter-state transmission charges, SLDC charges and backdown.

Pages 19–30 cover capital: gross fixed assets, investment and capitalisation plans keyed to the approved business plan, year-wise capital expenditure, financing of capitalised works and capital works in progress — again separated by activity. Pages 31–33 handle working capital and interest and finance charges, including a weighted-average interest-rate computation on actual loans. Pages 34–43 cover R&M, employee cost, A&G, depreciation, provisions and debtors, other income, security deposits and non-licensed business. Pages 44–46 cover T&D losses and network physical characteristics, and pages 47–60 the revenue side — monthly sales, revenue at prevailing and proposed tariffs, wheeling and minimum charges, and category-wise revenue tables for the LT and HV consumer categories.

The text sets out what must be filed, not what the numbers should be; no norms, thresholds, issuer, number or commencement are stated in it.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), ARR and true-up, Wheeling and retail supply tariff

Read with this

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document