Skip to content

OERC · Odisha Electricity Regulatory Commission

Ancillary Services Regulations, 2026 — Draft

Odisha Electricity Regulatory Commission (Ancillary Services)Regulations, 2026

Draft regulationDated 20 May 2026No. OERC/ENGG.- 01/2026/614 dated 20.05.2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

p1 is a public notice dated 20.05.2026: OERC states it has pre-published the draft OERC (Ancillary Services) Regulations, 2026 under s.181(3) of the Electricity Act, 2003 and invites views/suggestions by 20.06.2026; the draft is posted on the Commission's website. The draft text follows.

p2 gives the title. The notification clause (p3) cites ss.181(zi) and 181(zp) read with s.86(1)(c),(h),(i) and says the regulations take effect from Gazette publication. Regulations 1–2 (p3) set short title, commencement and the objective: state-level procurement, deployment and payment of ancillary services to help the SLDC minimise state deviation, maintain frequency and relieve intra-state congestion. Regulation 3 (pp3–6) defines the core terms; Regulation 4 (p7) applies the regulations to intra-state entities, including energy storage and demand response; Regulation 5 (p7) lists PRAS, SRAS, TRAS and other services; Regulation 6 (p7) makes the Nodal Agency estimate and publish SRAS/TRAS requirements.

Part I (pp7–13) covers SRAS: eligibility (Reg 7), ACE-based activation and control modes (Reg 8), procurement by standing consent and declarations (Reg 9), selection and despatch through a Custom Participation Factor (Reg 10), payment from the State Deviation & Ancillary Service Pool Account (Reg 11), performance monitoring and incentives (Reg 12), and disqualification for persistent underperformance (Reg 13).

Part II (pp13–17) covers TRAS: eligibility (Reg 14), activation (Reg 15), procurement through Day Ahead and Real Time AS markets on power exchanges (Reg 16), price discovery — uniform clearing for TRAS-Up and pay-as-bid for TRAS-Down (Reg 17), scheduling and despatch (Reg 18), and payment including commitment charges (Reg 19).

Part III (pp17–18) makes s.62 generating stations and their un-requisitioned surplus available to the Nodal Agency when market procurement falls short or in emergencies. Part IV (pp18–19) provides accounting, settlement through the DSM mechanism and exemption from transmission charges/losses for AS. Part V (pp19–21) requires a Detailed Procedure within three months and gives the Commission power to relax provisions and remove difficulties.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Power markets and exchanges

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document