Skip to content

NERC · Nagaland Electricity Regulatory Commission

Terms and Conditions for Intra-State Open Access Regulations, 2012

Nagaland Electricity Regulatory Commission (Terms and Conditions for Intra–State Open Access) Regulations, 2012

RegulationDated 31 Jan 2012No.NERC/REGN/2012(C) dated Dated Kohima, the 31st Jan, 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Nagaland Electricity Regulatory Commission issued these principal regulations on 31 January 2012 under notification No.NERC/REGN/2012(C), using powers in the Electricity Act, 2003 (p1–2). They extend to the whole State of Nagaland and apply to open access use of the intra-state transmission system and/or distribution systems of licensees, including when used with the inter-state transmission system (p2–3). They commence from Gazette publication, but the Gazette date is not printed (p2).

The regulations define key terms, then set eligibility: licensees, generating companies, captive generating plants and consumers are eligible, with consumers seeking open access for capacity of 1 MW and above expressly covered and a proviso allowing the Commission to permit less than 1 MW later (p5). Persons with more than two months' outstanding dues are ineligible (p6). Long-term open access is for five years or more; short-term is all other access, capped at one year at a time (p6–7). The STU or distribution licensee is nodal agency for long-term access, depending on location, and SLDC for short-term access (p8).

The procedures cover detailed guidelines and forms, long-term application processing and system-strengthening timelines, bulk capacity agreements, exit options, short-term applications and consequences of non-utilisation (p8–12). Charges comprise transmission/wheeling charges, cross-subsidy surcharge, additional surcharge, scheduling and system operation charges, and other charges, with a methodology for short-term rates (p12–16). Curtailment prioritises short-term customers first, pro-rata within each category (p16).

The remaining provisions require SLDC to publish open access information, prescribe special energy meters, allocate energy losses, govern billing, default and grid-code compliance, create a grievance route to SLDC and then the Commission, require quarterly reports, address communication facilities, and give the Commission powers to remove difficulties and amend the regulations (p17–22).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Congestion and curtailment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document