Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

U.P. Electricity Ombudsman (Terms & Conditions of Service) Regulations, 2007

U.P. Electricity Ombudsman (terms & conditions of Service) Regulations, 2007

RegulationDated 17 Sep 2007Notification No. U.P.E.R.C./Secy/Regulation/07/1186 dated September 17, 2007

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is UPERC's 2007 regulation fixing the terms on which the State Electricity Ombudsman is appointed and holds office — the office created under s.42(6) of the Electricity Act, 2003 to hear consumer representations against distribution licensees (p1). Regulation 1 gives the title, extends it to the whole of Uttar Pradesh, brings it into force on Gazette publication and makes the English text prevail over Hindi in case of conflict; the Gazette date is not printed (p1). Regulation 2 defines Act, Commission, Chairperson and Electricity Ombudsman (p1). Regulation 3 requires an Ombudsman appointed by the Commission, permits more than one with specified territorial jurisdiction, deems the Ombudsman appointed under the repealed 2003 regulations to be appointed under these, and sets the eligibility bar — engineering degree, utility experience, a Chief Engineer or equivalent post and a minimum age (p1). Regulation 4 requires open advertisement, allows temporary designation at the Commission's discretion, and creates a Selection Committee of the Chairperson, Commission Members and a power-sector expert (p2). Regulation 5 covers tenure, reappointment, the upper age limit, resignation and removal — including removal for insolvency, misconduct, conviction, incapacity or financial interest, with a Commission-Member enquiry beforehand — and deems the Ombudsman a public servant (p2). Regulation 6 sets the pay scale and benefits, the deputation option, and funding from the s.103 fund with Commission budget as bridge (p2–3). Regulations 7–9 give the Commission power to remove difficulties, to amend, and repeal the 2003 regulations from the date these come into force (p3).

Standard name
CGRF and Ombudsman
Primary topics
Electricity ombudsman

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document