Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Meghalaya State Grid Code Regulations, 2026

Meghalaya State Electricity Regulatory Commission (State Grid Code) (6 of 2026) Regulations, 2026

CodeDated 10 Aug 2026No. MSERC/SGC/2021/155 dated 10th August 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 190. Check the regulator's original before you rely on it.

These are the Meghalaya State Electricity Regulatory Commission (State Grid Code) (6 of 2026) Regulations, 2026, notified by MSERC on 10 August 2026 under s.181(1)(zp) read with s.86(1)(h) of the Electricity Act 2003 (p7, p9). They are presented as the successor to the earlier 2012 State Grid Code process and are intended to align Meghalaya's intra-state grid with the CERC Indian Electricity Grid Code 2023 (p7). The pages cover the notification, public-consultation record and order (pp1–8), Chapter 1 definitions and applicability (pp9–21), Chapter 2 grid-code governance (pp22–27), Chapter 3 resource planning (pp27–28) and the start of Chapter 4 connection code (pp28–32). Later chapters are mapped from the contents table: commissioning, operation, system security, frequency/voltage, operational planning, scheduling and despatch, metering, protection, outage planning, monitoring, inter-user boundary safety and miscellaneous provisions (pp33–95), followed by application formats and a connection agreement (p96, p146).

The code applies to the STU, Users connected to the intra-state transmission system and SLDC (p9). It defines Users broadly, including generating companies, captive plants, energy storage, transmission and distribution licensees, solar/wind park developers, hybrid systems and bulk consumers connected at 33 kV and above (p21). Chapter 2 gives STU and SLDC implementation responsibility, sets out their statutory roles, and creates the State Grid Code Review Committee and Protection Coordination Committee, with review and amendment procedures requiring Commission approval (pp22–27). Chapter 3 cross-refers demand forecasting and generation resource adequacy to MSERC's Resource Adequacy Regulations, 2023, and requires STU transmission adequacy planning consistent with CEA criteria (pp27–28). Chapter 4 sets the connection process: application to STU, connection agreement, first-time energization procedure, interconnection studies, communication and data duties, site responsibility schedules, and connection-point rules for generating stations, distribution licensees, EHV consumers, open-access customers and renewable generators (pp28–32).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Connectivity and GNA, Scheduling and despatch

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document