Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Power Purchase and Procurement Regulations, 2012

Meghalaya State Electricity Regulatory Commission (Power Purchase and Procurement) Regulations, 2012

RegulationDated 24 Aug 2012NO.MSERC/77/2012/04 dated 24th August 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Meghalaya State Electricity Regulatory Commission's principal regulation governing how distribution licensees in the State buy and plan for power. It was issued by notification dated 24 August 2012 under s.181(1) read with s.86(1)(b) of the Electricity Act, 2003, and comes into force on the date of its notification in the Gazette of Meghalaya — the Gazette date itself is not printed (p1). It applies to all distribution licensees in Meghalaya for purchase and procurement of power for distribution and supply (p1).

Chapters 1 and 2 give the short title, commencement, applicability and a short definition list; anything undefined falls back to the Act (p1–2). Chapter 3 (p2) sets the basic procurement obligation: purchase must be economical and through a transparent competitive-bidding process, agreements with generators, traders or licensees must follow the least-cost method and need prior Commission approval, and agreements entered into before commencement are deemed to be made under these regulations and continue until expiry, subject to the Commission's power to order cancellation if terms are against consumer interest.

Chapter 4 (p2–10) is the planning core. It requires each licensee to assess and plan before procuring: a seven-year annual demand forecast by category (with a rule for treating a category as 'major'), demand estimates for defined morning and evening peak slabs including a load-curtailment plan, submission by a fixed annual date alongside the tariff filing and Energy Requirement Calculations statement, public objection procedures, and Commission approval of the forecast (p2–4). It then requires a matching seven-year supply-availability assessment, consultation with a wide set of state, central, regional and CEA bodies, and a tiered power procurement plan — long term, medium term and short term — with a rolling five-year plan refreshed annually, defined submission dates, Commission review windows, publication options and approval timelines (p5–7). Criteria for purchase are to be laid down by the Commission, covering government policy and allocation, MoP competitive-bidding guidelines, RPO Regulations, consultation with the STU and SLDC, spinning reserve, spot/bilateral and overdrawal mechanisms, least cost, and a preference for zero-cost generation such as run-of-river hydro and renewables; the licensee must also avoid importing reactive power at low voltage (p7–8). The short-term segment specifies quarterly plans, the contents of the proposal, approval within a fixed window, a Commission-set ceiling on landed cost and price bands for graded demand levels, and month/week/hourly forecasting (p8–9). It then sets the daily procedure for purchase (intimation to SLDC, use of SLDC-computed incremental and total costs), the criteria for reviewing new or amended PPAs, and a consultation mechanism among licensees (p9–10).

Chapter 5 (p10–12) gives procurement guidelines: efficiency and transparency, alignment with the approved load forecast and purchase plan, adherence to MoP guidelines and Commission directions, the rule that no purchase happens without Commission authorisation except purchases under six months, filing of contracts within one month, limits on routine short-term buying, and the Commission's power to fix a short-term price limit along with the factors it weighs. It also covers notification of the procurement proposal, a Request for Qualifications, bid evaluation criteria, and Commission oversight including cancellation of tenders.

Chapter 6 (p12–13) is miscellaneous: removal of difficulties, power to relax, power to amend, and savings preserving the Commission's powers to issue orders in public interest and to adopt procedures at variance with these regulations.

Standard name
Power Procurement Regulations
Primary topics
Power procurement and PPAs, Resource adequacy, Competitive bidding

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document