Biomass, Biomass Gasifier and Non-Fossil Fuel Based Cogeneration Tariff Regulations, 2016

Jharkhand State Electricity Regulatory Commission (Determination of tariff for procurement of power from biomass, biomass gasifier and non-fossil fuel based cogeneration power project) Regulations, 2016

RegulationDated 28 Sep 2016Published in the Gazette 8 Dec 2016No.53 dated 28th September 2016

1 amendment to it is on Voltaic, dated 31 Dec 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Jharkhand State Electricity Regulatory Commission's principal tariff regulation for grid-connected biomass, biomass gasifier and non-fossil-fuel cogeneration power, notified on 28 September 2016 (No. 53) and published in the Jharkhand Gazette Extraordinary of 8 December 2016 (p1). It is made under ss. 86(1)(a)–(c) r/w (e), 61(a)–(h) and 62(1) of the Electricity Act 2003 (p1). It applies to the whole State of Jharkhand, takes effect from gazette publication, and runs to 31 March 2020, with a control period of 1 April 2016 to 31 March 2020 (p1, p5).

A3 sets who qualifies (pp4–5): Rankine-cycle biomass projects using new plant and machinery with fossil fuel use restricted to 15% of total annual fuel consumption; gasifier projects using 100% producer gas engines with MNRE-approved gasifier technology; and non-fossil-fuel cogeneration in topping cycle mode that meets a combined useful power plus half-thermal output threshold. Projects in notified rural areas supplying off-grid are expressly outside Commission tariff determination (p5).

A4 is the operative core (pp5–17). It provides for Commission-determined generic tariffs (suo-motu), with an option for project-specific tariff on petition, and specifies the petition contents and fee route (pp6–7). Tariffs are cost-plus, single-part with a levellised fixed component referenced to the year of commissioning and a year-of-operation fuel component. It fixes tariff periods, plant useful life, and the operational and financial norms used in the cost build-up — capital cost (with a WPI-based indexation formula), plant load factor, auxiliary consumption, debt-equity, loan tenure and interest, depreciation, O&M with escalation, working capital and interest thereon, return on equity, station heat rate, specific fuel consumption, calorific value, base-year fuel cost and the fuel-price indexation/ escalation choice (pp8–17).

A5 sets commercial terms (pp18–21): transmission/wheeling charges and losses for third-party and captive use, the must-run and scheduling treatment of these plants, metering and billing, the payment settlement period with late payment surcharge and early-payment rebates, third-party sale on discom default, start-up power, shutdown drawal limits, banking of energy and its treatment, evacuation infrastructure cost responsibility, State/Central incentives and accelerated depreciation adjustments, and pass-through of taxes and duties.

A6–A8 give the Commission power to remove difficulties, to amend, and savings clauses (pp21–22). The Appendix carries the petition formats for assumptions and tariff computation and the indexation variable values (pp23–26).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Generation tariff

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗