JSERC · Jharkhand State Electricity Regulatory Commission
Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2016
Jharkhand State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2016
RegulationDated 28 Sep 2016Published in the Gazette 8 Dec 2016No.57 dated 28th September 2016
1 amendment to it is on Voltaic, dated 9 Feb 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The JSERC issued these principal regulations on 28 September 2016 (p1), with the stated objective of facilitating large-scale grid integration of solar and wind generating stations while maintaining grid stability and security under the Grid Code through forecasting, scheduling and a commercial deviation-settlement mechanism (p1). They extend to the whole of Jharkhand and come into force from publication in the Official Gazette; the Gazette printed here is dated 8 December 2016, and the regulations remain in force up to 31 March 2021 unless reviewed earlier or extended (p1).
Chapter A1 gives short title, commencement and extent (p1). Chapter A2 defines the operational vocabulary — absolute error, available capacity, deviation, gaming, pooling station, QCA, state entity and time-block, among others — and imports undefined terms from the Act, Grid Code or other JSERC regulations (p2–4).
Chapter A3 sets the application scope: wind and solar generators supplying Discoms, third-party open-access consumers or captive users through open access, with a 5 MW threshold at individual/combined or pooling-station level (p5). Chapter A4 creates the forecasting and scheduling code. It provides for day-ahead and week-ahead schedules, 15-minute time blocks, intra-day revisions on a one-and-a-half-hourly basis, and the role of the QCA as the single coordinating agency per pooling station, though QCA is not compulsory (p5–7). SLDC may also forecast for grid security and may engage agencies; generators may use SLDC's forecast or their own (p6). Existing generators must establish forecasting tools within three months, new generators before commissioning (p6).
Chapter A5 specifies interface metering through Special Energy Meters, telemetry at turbine/inverter level, real-time data provision to SLDC and a detailed procedure to be prepared by SLDC, published for public comment and submitted to the Commission within two months (p7). Chapter A6 establishes commercial and deviation settlement. Generators are paid by buyers as per actual generation; deviations are settled through the State DSM Pool, with Table 1 setting absolute-error slabs for deviation charges (p7–8; table p8). It covers QCA de-pooling, SLDC records, treatment of renewable generators as a virtual pool, annual accounts, transfer of year-end DSM pool balances to a separate SLDC-operated fund, a 10-day payment deadline, and settlement of out-of-state supplies under the CERC DSM Regulations, 2014 (p8–9). Chapter A7 gives the Commission powers to remove difficulties, relax provisions, issue directions, decide interpretation, conduct enquiries and amend the regulations (p9–10).
Read with this
Amendments and corrections
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.