Skip to content

NERC · Nagaland Electricity Regulatory Commission

Electricity Supply Code Regulations, 2012

Nagaland Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012

CodeDated 9 May 2012No.NERC/REGN/2012(A) dated the 9th May, 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software, from pages 1 to 45 of 109. Check the regulator's original before you rely on it.

These are the Nagaland Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012, notified by NERC, Kohima, on 9 May 2012 and extending to the whole State of Nagaland (p1–3). They apply to all distribution licensees and their consumers in the State (p3). They come into force from the date of publication in the Nagaland official gazette. The regulation is made under s.181 read with ss.50, 43(1), 44, 46, 47(4) and 56 of the Electricity Act 2003, the Electricity (Amendment) Act 2007 and the Electricity (Removal of Difficulties) Order 2005 (p2).

Chapter 1 (pp2–11) covers general provisions: definitions, the rule that the Supply Code prevails over existing Terms & Conditions of Supply where inconsistent, and a requirement for licensees to submit their Terms & Conditions of Supply for Commission approval within six months (p9). It establishes an Electricity Supply Code Review Committee with government, licensee, STU, SLDC and consumer representatives, sets its functions, and lays down the process and frequency for amending the Code, ordinarily once a year with public consultation and gazette notification (pp9–11).

Chapter 2 (pp11–13) specifies the system of supply — declared frequency, voltage classes for LT, HT and EHT, permissible voltage variation bands — and links consumer classification, tariff and conditions of supply to Commission tariff orders, with safeguards before reclassification (pp11–13).

Chapter 3 (pp14–20) sets the new-connection framework: licensee duty to supply on application, exceptions, application forms and supporting documents, service line arrangements, multistoried-building connections, service connection cost, consumer-executed service lines, and timeframes for providing supply, including cases requiring system augmentation or new substations (pp14–20).

Chapter 4 (pp21–32) deals with consumer premises wiring and apparatus: compliance with Indian Electricity Rules and BIS specifications, general wiring conditions, treatment of apparatus interfering with the system, AC motor installations, power-factor correction capacitors and disconnection for poor power factor, HT/EHT controls, inspection and testing of installations, connected-load rating/re-rating, and consumer generators/inverters including parallel operation with the licensee's system (pp21–32).

Chapter 5 (pp33–37) specifies point(s) of supply, equipment to be installed by consumer and licensee, dedicated feeders, licensee equipment on consumer premises, damage and ownership, and fuse/supply failure procedures (pp33–37).

Chapter 6 (pp38–45) covers service-connection matters after connection: change of consumer category, transfer/mutation of connection, changes in wiring or shifting service line, enhancement and reduction of contract demand, permanent disconnection, notice of vacation/transfer of premises, and agreement requirements and formats (pp38–45).

The remaining chapters, with cross-references indicating later chapters on billing/non-payment in Chapter 9 and unauthorized use in Chapter 10 so the structural map beyond Chapter 6 is incomplete (p28, p44).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Electrical safety

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document