AERC · Assam Electricity Regulatory Commission
Net Metering Connection Agreement (model form)
Net Metering Connection Agreement
AgreementDated 14 May 2015
Replaced by Grid Interactive Solar PV Systems Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Made under a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a standard-form, fill-in-the-blanks Net Metering Connection Agreement to be executed between an Eligible Consumer (owner of a grid-interactive solar PV system) and the local Distribution Licensee, called the Discom (p1). The recitals have the consumer declaring the PV capacity and seeking connectivity under a net-metering arrangement, and the Discom agreeing to connect the plant under the Assam Electricity Regulatory Commission (Grid Interactive Solar PV Systems) Regulations, 2015 as amended (p1).
Clause 1 makes the consumer responsible for knowing and meeting the standards it must satisfy, cross-referring the state distribution code and conditions of service, CEA Technical Standards for Connectivity of Distributed Generated Resources Regulations, 2014, CEA meter and safety regulations, AERC supply code and distribution code, and MNRE solar PV specifications (p1–2). Clause 2 is the technical core: isolation device and Discom access, shutdown on outage, standards compliance, Discom-specified interface and metering points, a lettered checklist of power quality parameters (harmonics, synchronisation, voltage window, flicker, frequency, DC injection, power factor, islanding, overload, paralleling device), a bar on hybrid inverters, battery back-up rules, the O&M responsibility split at the net meter, and the bi-directional plus solar generation metering arrangement (p2–3).
Clauses 3–6 cover safety compliance and forced disconnection (p4), clearances and approvals (p4), Discom access and emergency disconnection (p4), and mutual indemnity with exclusion of indirect losses, plus Discom responsibility for delivering government fiscal incentives (p4). Commercial settlement is deferred to the net-metering guidelines of the 2015 Regulations, the consumer bears all setup and interconnection costs, and either side may terminate on 30 days' notice (p5). No dates, fees, tenure or dispute-resolution clause are given.
Read with this
Voltaic does not hold the regulation itself.
No other documents to read with it are on Voltaic.