This is a short, site-specific MERC notification that writes the distribution licence conditions for a single SEZ-based licensee. It was issued on 27 September 2018 as No. MERC/TEC/ Licence Conditions/ KRC/2018/220, under s.181(2)(d) read with s.16 and s.14(b) of the Electricity Act, 2003 (p5).
Clauses 1–2 give the title, extent and commencement, and define the small set of terms the instrument needs — Act, Developer, Deemed Distribution Licensee, General Conditions, KRC, SEZ Act and SEZ Rules (p5). The regulations extend only to the SEZ area described in the two Government of India SEZ notifications of 19 June 2017 and 26 April 2018, and come into force on publication in the Official Gazette (p5).
Clause 3 makes the Specific Conditions plus MERC's General Conditions of Distribution Licence Regulations, 2006 the deemed conditions of KRC's licence. Clause 4 fixes the area of supply by reference to the SEZ notifications and a map in Schedule 1, and requires the licensee to approach the Commission within 15 days of any future SEZ notification or de-notification, continuing supply in a de-notified area until an alternative arrangement exists (p6). Clause 5 sets a 25-year licence term running from the SEZ notification date, or until revocation (p6).
Clauses 6–9 cover public inspection of the licence and conditions, a 24-hour supply obligation, the Commission's power to amend, and its power to remove difficulties by order (p6).
Read with this
Commencement notices and reasons
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.