MERC · Maharashtra Electricity Regulatory Commission

KRC Infrastructure IT/ITES SEZ Specific Conditions of Distribution Licence Regulations, 2018

Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to M/s. KRC Infrastructure and Projects Pvt. Ltd. for IT and ITES SEZ at Village Kharadi, Taluka Haveli, District Pune) Regulations, 2018

RegulationDated 27 Sep 2018No. MERC/TEC/ Licence Conditions/ KRC/2018/220 dated 27th September 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, site-specific MERC notification that writes the distribution licence conditions for a single SEZ-based licensee. It was issued on 27 September 2018 as No. MERC/TEC/ Licence Conditions/ KRC/2018/220, under s.181(2)(d) read with s.16 and s.14(b) of the Electricity Act, 2003 (p5).

Clauses 1–2 give the title, extent and commencement, and define the small set of terms the instrument needs — Act, Developer, Deemed Distribution Licensee, General Conditions, KRC, SEZ Act and SEZ Rules (p5). The regulations extend only to the SEZ area described in the two Government of India SEZ notifications of 19 June 2017 and 26 April 2018, and come into force on publication in the Official Gazette (p5).

Clause 3 makes the Specific Conditions plus MERC's General Conditions of Distribution Licence Regulations, 2006 the deemed conditions of KRC's licence. Clause 4 fixes the area of supply by reference to the SEZ notifications and a map in Schedule 1, and requires the licensee to approach the Commission within 15 days of any future SEZ notification or de-notification, continuing supply in a de-notified area until an alternative arrangement exists (p6). Clause 5 sets a 25-year licence term running from the SEZ notification date, or until revocation (p6).

Clauses 6–9 cover public inspection of the licence and conditions, a 24-hour supply obligation, the Commission's power to amend, and its power to remove difficulties by order (p6).

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions

Read with this

Commencement notices and reasons

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document