UPERC · Uttar Pradesh Electricity Regulatory Commission
General Conditions of Distribution Licence Regulation, 2004
UP Electricity Regulatory Commission (General Conditions of Distribution Licence) Regulation No. 4361 / 2004
RegulationDated 31 Dec 2004UPERC / Secy / 2004-4361 dated December, 31, 2004
Summary
Summary written by software, from pages 1 to 41 of 46. Check the regulator's original before you rely on it.
This is UPERC's standing rulebook of general conditions that attach to every distribution licence in Uttar Pradesh, rather than a licence granted to a named company. It was issued on 31 December 2004 as Notification No. UPERC/Secy/2004-4361 under section 16 read with section 181 of the Electricity Act 2003 (p1). It applies to all distribution licensees in their respective licensed areas (p1) and, once in force, also to deemed licensees under the listed provisos to section 14 (p38). It comes into force on a date the Commission is to appoint by notification, which is not printed (p1); the English text prevails over the Hindi translation (p1).
Clause 2 defines the vocabulary — Licensed Business, Other Business, Area of Supply, Major Incident, Specific Conditions and the like — and treats references to other instruments as referring to their current versions (pp1–6). Clause 3 ties the licence term to the order granting it (p6). Clauses 4–5 set compliance duties and list what the licensee may do only with Commission approval: buying or acquiring electricity, mergers and takeovers, assigning the licence, acquiring interests in other licensees, trading, open access, other businesses, franchising, group-company contracts and loans (pp7–11). Clause 6 sets accounting and reporting duties, including interim statements and auditor's reports (pp11–13); clause 7 covers information calls, major-incident reporting and compensation, the business plan and annual progress reporting (pp13–15).
Clause 8 deals with licence fees and the consequences of late payment, deferring amounts to the Fees & Fine Regulations (pp15–16); clause 9 requires five-year rolling investment plans and prior approval of major investments (pp16–19); clause 10 controls transfer of assets and change of control (pp19–20). Clauses 11–12 set out revocation grounds, notice requirements, and suspension with an administrator (pp20–23). Clause 13 lets the Commission arbitrate licensee and generator disputes (p23); clauses 14–17 tie the licensee to the Grid Code, the Supply Code, a Customer Charter and consumer right to information, licensee-prepared technical codes, and standards of performance with compensation for failure (pp23–26). Clauses 18–21 cover load forecasting, authorisation to procure power, a disaster management plan, grievance redressal forums, open access, and expected-revenue and tariff filings (pp26–31). Clauses 22–29 prohibit subsidies and undue preference, handle cross-subsidy surcharge, and set obligations to connect and supply along with powers to recover dues, disconnect and enter premises (pp31–36). Clauses 30–33 cover amendment of conditions, competition, penalties and miscellaneous matters, including waiver or modification through Special Conditions (pp36–38). Schedule 1 describes the area of supply and the grant application form follows (pp40–41).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.