GERC · Gujarat Electricity Regulatory Commission
Multi Year Tariff Regulations, 2011 — First Amendment, 2015 — Draft
Gujarat Electricity Regulatory Commission (Multi Year Tariff) (First Amendment) Regulations, 2015
Draft amendmentDated 18 Dec 2015
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's draft First Amendment to its Multi Year Tariff Regulations, 2011. The operative part (pp1–2) proposes three additions to the Principal Regulations: a proviso to clause 74.1.2 waiving intra-state transmission tariff for transmitting energy from gas-based capacity that benefits under the Government of India scheme notified by the Ministry of Power's Office Memorandum No. 4/2/2015-Th-I dated 27 March 2015; a proviso to clause 75.1 requiring the Annual Transmission Charges determined by the Commission to be reduced to the extent of the resulting shortfall in recovery; and a proviso to clause 77.1 providing that transmission system users bear no transmission energy losses for such energy. All three are limited to FY 2015-16 and 2016-17 and come into force on publication in the Official Gazette (Gazette date not printed; the draft is dated 18/12/2015). The regulations extend to the whole of Gujarat.
The Explanatory Memorandum (pp3–6) explains why. The MoP scheme supplies imported spot RLNG ("e-bid RLNG") to stranded gas plants and to plants receiving domestic gas up to a target PLF, with support from the Power System Development Fund and sacrifices by several stakeholders; para 5(x) of the scheme waives CTU/STU transmission charges and losses on the lines of solar power. The memorandum lists the Gujarat plants covered, sets out the scheme's funding and eligibility features, and records the State Government's direction under section 108 of the Electricity Act, 2003 (letter dated 17 Nov 2015) asking GERC to waive transmission charges and losses and to keep the net price to discoms within the scheme's target price.
The annexures reproduce the source material: the State Government's section 108 direction (pp26–28), the full MoP Office Memorandum (pp29–38), the lists of stranded gas-based plants (Annexure I, pp39–40) and plants receiving domestic gas (Annexure II, pp41–42), the revised customs duty waiver procedure (Annexure III, p43), the gas swapping and co-mingling simplification (p44), and the reverse e-bidding mechanism for PSDF support and its operational mechanism (pp45–47).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.